$0-$4K Electrical bid

Starting 3 Jul 19 Mascot, NSW

Project Timeline

  1. 20 Feb 19

    Your bid is due

  2. 3 Jul 19

    Start job

  3. 25 Feb 19

    Finish job

New Home Project Involving

TestingSwitchboardsInstallationWiring
Need Level 2 Electrician.Install private pole. Hole/trench will be pre dug.New three phase ariels. As existing ones most likely won’t reach.Connect existing temporary board cable to pole connection.Later down the track:Supply and connect new advanced three phase meter for house.Supply and connect new advanced single phase meter for granny flat.All switchboard work will be pre-wired.Tag, test and label all switchboard.

Status

Construction is underway

Budget

$0-$4K

Budget includes materials

Posted by

Profile picture of job poster

Trublu Electrical

Send me Electrical job leads