$0-$4K Electrical bid

Starting 15 Aug 19 Mascot, NSW

Project Timeline

  1. 20 Feb 19

    Your bid is due

  2. 15 Aug 19

    Start job

  3. 25 Feb 19

    Finish job

New Home Project Involving

TestingSwitchboardsInstallationWiring
Need Level 2 Electrician.Install private pole. Hole/trench will be pre dug.New three phase ariels. As existing ones most likely won’t reach.Connect existing temporary board cable to pole connection.Later down the track:Supply and connect new advanced three phase meter for house.Supply and connect new advanced single phase meter for granny flat.All switchboard work will be pre-wired.Tag, test and label all switchboard.

Status

Construction is underway

Budget

$0-$4K

Budget includes materials

Posted by

Profile picture of job poster

Trublu Electrical

Send me Electrical job leads