$30K-$35K Concrete bid

Starting 8 Aug 19 Sea Cliff, San Francisco, CA

Project Timeline

  1. 21 Jun 19

    Your bid is due

  2. 8 Aug 19

    Start job

  3. 23 Aug 19

    Finish job

Remodel Project Involving

Saw CuttingFootingsSlabbingDrillingFormworkDrainageRetaining WallsPouring and Finishing
Footings & Retaining WallsForm and pour footings & retaining walls.Drill & epoxy dowels into existing.Install post Base Hardware.5.2.0SlabsForm and pour basement & light well slabs.Install crushed gravel, vapor barrier.5.3.0Water Proofing & DrainageInstall water proof membrane on light well retraining walls.Install basin drain , tie into existing drain.5.4.0Saw CuttingSaw cut existing footing for new window opening.5.5.0Anchor Bolt Retro FitDrill & epoxy anchors bolts into exiting footings.

Status

Awaiting permits

Requirements

General Liability
B - General Contracting
C-8 - Concrete

Budget

$30K-$35K

Budget includes materials

Documents

  • Attachment IconAttachment on Job Tana+-+Plan+Set.pdf

Viewable once you apply