$0-$1K Plumbing bid

Starting 1 Dec 18 South Berkeley, Berkeley, CA

Project Timeline

  1. 9 Nov 18

    Your bid is due

  2. 1 Dec 18

    Start job

  3. 1 Dec 18

    Finish job

High End Residential Project Involving

GasPEX Pipe InstallationInstallation
Install 3/4” gas line for Generator: - Shut off the gas system at the meter. - Upsize the gas Inlet tee to 1 inch.Install a 1x3/4 branch for the new gas line. Install gas pipe from the meter to the generator location that’s only 4 feet away.

Budget

$0-$1K

Budget includes materials

Posted by

Profile picture of job poster

Sonomarin Solar & Electric

Send me Plumbing job leads