Under the federal FLSA, covered employers must keep accurate records of hours worked, pay rates, overtime earnings, wage deductions, and pay periods. Generally, payroll records must be retained for at least three years, while time cards and other wage-calculation records must be kept for at least two years. State laws, contracts, and prevailing-wage requirements may require additional records or longer retention. Keep the original time records and document corrections so disputed hours can be reviewed.
Check who has permission to edit the approved record and whether the change requires renewed review under company policy. In Workyard, administrators can edit time cards within their access, while managers have permissions set by their role. Record why the entry changed, confirm the affected hours and job coding, and reconcile any payroll export already completed. Do not assume an approved time card automatically updates payroll after an edit.
Compare the approved time-card totals with the payroll import for the same pay period, employee, and pay type. Investigate missing workers, mismatched employee mappings, omitted overtime hours, and any job or cost-code fields needed downstream. Correct mapping or import errors before processing payroll, then retain the reconciliation. Integration fields and steps depend on the payroll system.
No. Certified payroll is required on certain covered construction work, including federal or federally assisted jobs subject to Davis-Bacon and Related Acts requirements, and may also be required under state or local rules. For covered federal work, payroll information and a signed Statement of Compliance are submitted weekly; use of Form WH-347 itself is optional.
Not necessarily, and Workyard does not. Workyard supports field time capture, job and cost-code records, approvals, and payroll-data exports. The contractor and its payroll provider remain responsible for wage calculations, withholdings, tax deposits, returns, and any corrections to filed forms.
Start with the hours actually worked, keep each job and rate change recorded, and check missed or interrupted breaks before payroll approval. Apply the correct federal, state, and contract rules to the whole workweek. When multiple straight-time rates apply, payroll must verify the required regular-rate calculation rather than assume the last job rate controls overtime. Software can handle configured checks, but a person must resolve disputed time, rate classifications, and legal exceptions.
Review the last two or three payroll runs for repeated corrections, then place a check where each error starts. Have supervisors confirm missing punches, job changes, and meal-period disputes daily. Have payroll verify workweek overtime, mixed rates, classifications, and imported totals before accepting the payroll file. Correct the original time card, document the change, and recheck the transfer instead of repeatedly editing pay after the run.

