Skip to content
Log InBook a demo
Book a demo

Construction job costing software

Know what every job costs in real time

Hours land on the right job and cost code, and each job’s cost updates as every shift ends. A job running heavy shows up this week, while there’s still time to fix it.

Workyard’s Project Time & Cost for the week of Aug 11, for an electrical contractor: 26-104 Riverside Duplexes 236 labor hours, 18.5 equipment hours and 12 overtime hours, $11,182; 31-210 Maple St Retail 98 labor, 14 equipment and 6 overtime hours, $5,432; 27-203 Fairview Clinic 34.5 labor and 10 equipment hours, $1,999; the shop at Oak Yard 8 labor hours, $336; $18,949 in all.

Join 3,000 of America's most ambitious contractors

  • About 5visits saved per job

    "I would probably ballpark it to be roughly about $5,000 and that's just something that we saw fairly immediate, where we were able to save roughly about five visits per job"

  • 100s of hrssaved a week routing supervisors by proximity

    "It's preventing us from losing more on each project — saving us money."

  • TruTek logo
  • $123Ksaved with Workyard’s Smart Forms

    "Smart Forms pays for itself through accurate invoicing, insurance savings, and keeping our business moving every single day."

  • Cover logo
  • "We wanted more than a time tracking app since many exist. We sought something that helps beyond just tracking time."

    Brian Mata, Project ManagerWagler Custom Homes

  • Pro Home and Sunrooms logo
  • "Of all the solutions we’ve been exposed to, Workyard is the best. It’s a good value for the money, and the team is always willing to work with you to meet your needs."

    James Monzello, CFOGreen Wall Tech

  • Allied logo
  • 30%+rise in client reimbursements

    "We can present a complete bill to clients at the end of every 30 day period with an audit trail. Prior to Workyard we didn’t have that supporting evidence."

  • Mainsail Painting logo
  • "If you have field crews, Workyard is one of those tools that pays for itself. It saves us hours every payroll, keeps everyone accountable, and gives us real-time visibility into every job."

    Austin Lafferty, Operations ManagerTruControls

  • Construction Punch Services logo

How it works

The cost record builds itself, every day

Every verified hour carries its job and cost code from the moment it’s captured. Nothing to compile at month-end, so the number on the screen is never waiting on payroll.

Hours show up already coded

The geofence sets the job, workers pick from the job’s short list of codes, or the foreman codes the whole crew. Either way, hours and equipment land on the right job and cost code.

Drive coded to 31-210 Maple StLuis M. · 22 min · arrives 1:05 PM

No more hours on the wrong job

Drive time follows your rules, each arrival switches the job, and a forgotten clock-out is trimmed to when the worker left. Fix a miscoded hour in place, with the change logged.

Marcus R.’s Thursday in Automatic mode, coding itself as it goes: 7:14 AM arrives at 26-104 Riverside, time on the job; 12:10 PM a 12-minute drive to Home Depot, added to the next job, 31-210 Maple St, as Travel; 12:22 PM 22 minutes at Home Depot, not a job, added to Maple St; 12:44 PM a 21-minute drive to Maple St as Travel; 1:05 PM arrives at Maple St and the job switches; 4:02 PM leaves Maple St without clocking out, so the clock-out is trimmed to 4:02. The day: Riverside 4 hours 56 minutes, Maple St 3 hours 52 minutes.

See what every job is costing you, live

Open any job to see its labor and equipment cost in dollars and hours, overtime split out, updated as each shift ends. No waiting for month-end to know what a job is costing you.

The Overview of job 26-104 Riverside Duplexes in Workyard’s Project Hub for Aug 11 to Aug 17, 2026: total cost $11,182.40 across 4 cost codes, labor cost $10,504.40 across 6 members, equipment cost $678.00 for 2 pieces of equipment; 236 labor hours, 18.5 equipment hours and 12 overtime hours, 5% of labor hours; labor 94% of the total and equipment 6%.

Making adjustments has never been this easy

Tell Ask Workyard what happened and it drafts the time card change. Confirm it, and the hours move with the original kept in the log. Need numbers? Ask for a report in plain English.

Ask Workyard fixing a time card: asked “Dana spent Tuesday afternoon in the shop building the Maple St panel. Move it to Maple St.”, it reads the time cards and drafts the change, Dana C.’s Tuesday 1:00 to 4:30 PM moved from Shop · Oak Yard to 31-210 Maple St · Prefab; the change is confirmed and applied, the original kept in the log.

Approved hours post straight to accounting

Approve the week and the hours go to QuickBooks, Sage, Foundation, Acumatica, Spectrum or NetSuite by job and cost code. No re-keying, and your job cost report matches what the field did.

Animated example: an approved week is sent from Workyard to an accounting or ERP system and lands as time entries, each person's hours on their job, cost code and pay type, overtime on its own line

The payoff

Why contractors run job costs on Workyard

  • $156K

    a year in labor, back on the invoice

    Hours that used to go unbilled land, now on the right job so everyone makes it onto the invoice.*

  • 885 hrs

    of off-the-job time, trimmed automatically

    Paid time Basham Construction’s crews spent off the job, cut before it hit a job’s cost.

  • No surprises

    at closeout

    Costs update as each shift ends, so a job running heavy shows up this week.

  • Sharper bids

    on what each cost code took

    The next estimate starts from what the work actually cost.

*Modeled example: 25-person crew, 10% of hours unallocated, $30/hr. Assumes the hours are billable (T&M, cost-plus); actual recovery varies.

The results speak for themselves

View all customer stories
  • Solar
  • 80 employees
  • Texas

"I would probably ballpark it to be roughly about $5,000 and that's just something that we saw fairly immediate, where we were able to save roughly about five visits per job"

Victor RodriguezHR Field Manager

$5,000 a weeksaved on payroll and job costs

Read the story
  • Property management
  • 32 employees

"We can present a complete bill to clients at the end of every 30 day period with an audit trail. Prior to Workyard we didn’t have that supporting evidence."

Kelly AdreaniGeneral Manager

D&S Electric Group

  • Electrical
  • 10 employees
  • Georgia

"Let's say an $18/hour employee is off an hour each week. Once you factor in overtime, you're looking at more than $1,500 per employee each year just from those little mistakes."

Kathi SmithVice President

$10,000+a year saved on time card mistakes

Read the story

Features

Everything in Live Job Costs

  • Project Time & Cost

    Every job’s labor and equipment hours and cost, by day, week or month, updated at each clock-out.

  • Each job’s own codes

    Assign cost codes to each job, so crews pick from the few that belong there.

  • Cost code groups

    Give teams and people their own list of codes to see and pick.

  • Hours by geofence

    Walk onto a job and the hours go to that job, with the drive assigned by your rule.

  • Equipment hours

    Tag the machine at clock-in; its hours and cost land on the job and cost code.

  • Overtime in the cost

    Overtime at time and a half, double time at double, workers’ comp included.

  • Fix in place

    Move time to another job or code, or split a day, with the change kept in the log.

  • Ask Workyard

    Say what happened in a sentence; it drafts the change and makes it once you confirm.

  • Reporting Agent

    Ask for the report in a sentence, in your own layout, and rerun it any week.

  • Accounting sync

    Jobs and codes sync in; approved hours post back by job and cost code.

  • Cost by role

    Choose which managers see dollars; pay rates stay with admins.

  • Looking for something specific?

    If a crew needs it, we probably built it.

    Ask us

One platform between the jobsite and the office

Plug into what you already run

Connect 21 payroll, accounting and project systems. Your jobs and employees sync automatically.

Explore integrations
  • QuickBooks
  • Paychex
  • ADP
  • Oracle NetSuite
  • Trimble Viewpoint
  • Gusto
  • Sage
  • Foundation Software
  • Rippling
  • Acumatica
  • Deltek
  • Developer API
See how it all works together

Fair questions, straight answers

What owners and office managers ask us

Can I see what a job is costing me right now?

As of the last shift that ended. Each job’s labor and equipment hours and cost, by cost code, update as every shift ends, before you approve anything, on the web and in the app. The number you used to get at month-end is on the screen while the crew is still on the job.

How do hours end up on the right cost code?

The job comes from where the crew is: in Automatic mode, time on each job is assigned from the geofence. The cost code comes from whoever you put in charge of it: each worker picks from the codes assigned to that job, the foreman sets it for the whole crew, or a default code means there’s nothing to pick. Unusual time waits for your review.

Will the cost codes match our accounting system?

Yes. Jobs and cost codes sync in from QuickBooks Online and Desktop, Foundation, Sage 100 Contractor, Sage Intacct, Acumatica, Spectrum and NetSuite, so crews clock into your accountant’s real codes. Approved hours post back by job and cost code, so job costing in your system of record fills in without anyone re-keying a timesheet.

Do my guys have to scroll a 70-code list?

No. Assign cost codes to each job and a worker sees only the few that belong there. Cost code groups narrow it further by team or person, and where a job carries one code, set it as the default and there’s nothing to pick.

Does drive time land on the job’s tab?

Only if you want it to. In Automatic mode, driving goes to the next job, splits across the day’s jobs or stays unallocated, as you set it, with its own cost code if you like. A 20-minute drive stops quietly billing as work on a job.

Guys hit three or four jobs a day. Does the day split right?

Yes. In Automatic mode each arrival moves the time to that job, so a four-stop day comes back split four ways with the drive placed by your rule. For a day nobody coded as it went, split the time across jobs and codes on the time card afterwards.

What happens when an hour gets coded wrong?

Fix it in place. Edit the project time on the time card, or move a batch of time to another job and cost code at once, and the change is kept in the time card’s log. Or tell Ask Workyard what happened and confirm the change it drafts. Approved project time is locked.

Stop finding out at month-end

Live in days, not months, and a real person on the phone the whole way.

Book a demo with a Workyard specialist

Your local Workyard specialist

Works with 50 contractors across the US

Your details

30 min · Video call