Skip to content
Log InBook a demo
Book a demo

Enterprise · 100+ employees

Every crew in view. Every hour right in your ERP.

From one division to twenty, Workyard puts every crew on one live picture and lands each verified hour on its job and cost code in your ERP. Run the business on this week’s numbers, not last month’s payroll.

Sound familiar?

Where hours go wrong between the field and your ERP

  • The problem

    “It’s astronomical what we lose a day due to inaccurate timekeeping.”

    The solution

    Hours backed by where they happened

    Every punch carries its GPS location and is checked against the job’s geofence, so hours are settled by the record, not by memory or a round of phone calls.

  • The problem

    “It takes three people to hand key all the time sheets.”

    The solution

    Hours land in your ERP, coded

    Every hour goes to your ERP coded to job and cost code, through an out-of-the-box connector, a file in its exact import layout, or the API. Jobs, cost codes and employees sync in, so nobody keys anything twice.

  • The problem

    “We’re always a week behind because of payroll.”

    The solution

    Job costs as the day ends

    Labor hours and dollars by job and cost code update as shifts end, across every division.

The payoff

Why large contractors choose Workyard

  • 10%

    saved on payroll, on average

    Every hour is checked against its job site before payroll, so you pay for the time actually worked.

  • $5,000

    saved a week at Synaptic Solar

    Labor by job and cost code showed where the hours were going while the jobs were running.

  • 2 days

    back every week for a payroll team of four

    Hours reach payroll and accounting verified and coded, so the office approves instead of re-keying.

TruTek put all 120 crew on Workyard in two weeks

TruTek’s old software couldn’t show where its HVAC crews were working or what each job was costing. After a one-crew trial, all 120 employees were live within two weeks, and Isabel Tofstad caught over $1,000 in payroll errors in a single week.

Read the TruTek story
Two HVAC installers fitting ductwork in a framed house

How it works

Built for how you actually run

Payroll built on verified hours

Crews clock in as they walk through the gate, and every hour is checked against the job’s geofence. A missed clock-out is corrected from the geofence exit and flagged for a one-tap approval before payroll.

Marcus R.’s Tuesday on 26-104 Riverside, closed out: 8 hours regular, 1.5 hours overtime and a 30-minute meal break; he clocked in inside the job site’s geofence, a face photo was taken at clock in and clock out, and his daily sign-off says he took all of his meal breaks.

End of day · TuesdayMarcus R. · 26-104 Riverside

Signed off

  • 8.0 hRegular
  • 1.5 hOvertime
  • 30 minMeal break
GPSClocked in inside the geofenceVerified
Face photoAt clock in and clock outCaptured
Daily sign-off“Did you take all of your meal breaks?” YesSigned

Every hour lands in your ERP, coded

Jobs, cost codes and employees come in from your ERP. Approved weeks go back with every hour on its job, cost code and pay type, so no one keys them in twice, and an open API covers anything else.

Animated example: an approved week is sent from Workyard to an accounting or ERP system and lands as time entries, each person's hours on their job, cost code and pay type, overtime on its own line

Protect every job’s margin

Every hour lands on its job and cost code as it’s worked, drive time included. Project managers see labor by cost code today, across every division, not when the invoice arrives.

Fairview Clinic · 27-203

Live

Labor today · as of 4:46 PM46.5 h

  • Rough-in24.0 h
  • Conduit & wire16.5 h
  • Trim & fixtures6.0 h

Kiosk, phones or foreman. One set of time cards.

Big companies run more than one way in: a kiosk at the shop with a face photo at every punch, a foreman clocking in a crew that arrives together, phones for crews on the move. Every punch lands on the same time cards, reviewed and exported once.

Kiosk clock-in · face photoMarcus A. · 7:14 AM · Riverside gate

Each division, its own rules

Set up a rule group for each division, state or trade, and apply it to whole teams or to individual workers. Each group gets its own clock-in rules: auto clock-in at the geofence, a face photo, required cost codes, meal breaks and sign-off. Overtime rules follow the state, and each worker’s hours go to their own approver.

Workyard’s web app at Company Settings, Time, Time Clock: five rule groups (Default, Texas field crews with 84 team members, California crews with 41, Shop & yard with 22, Service techs with 36) beside the California crews group’s Time Clock Rules: Auto Clock In on geofence entry, a facial photo on clock out, and cost codes required.

AI that does the work. You approve.

Other tools wait for someone to do the work. Workyard’s agents check every timecard and flag only what needs you. That’s the whole job.

  • Ask Workyard

    New

    From quick answers to hours of work, handled

    • Answers about any crew, job or timecard
    • Builds the schedule the way you run your crews
    • Sweeps a whole pay period in one request
  • Timekeeping Agent

    Time tracking that runs itself

    • Clocks crews in and out, verified by GPS
    • Codes every hour to the right project automatically
    • Finds problem timecards and drafts the fix when you ask
  • Reporting Agent

    New

    Reports you need, without the spreadsheet work

    • Upload a report, or describe one
    • Custom reports filled with live Workyard data
    • Excel, CSV or PDF, ready to send

Straight answers

What enterprise teams ask us

Will it connect to our ERP and payroll?

Yes. Workyard has out-of-the-box connectors for the leading construction ERPs and payroll systems, a custom file in your system’s exact import layout for anything without one, and an extensive developer API for everything else. Find yours on the integrations page.

However it connects, the flow is the same. Your office approves the pay period and sends it in one step: each person’s hours go in by job, cost code and pay type, with overtime and double time already worked out by their state’s rules. With a connector, your jobs, cost codes and employees come in too, so crews clock into the records your books already use.

Nothing reaches your ERP until someone sends it, and connectors read your lists without editing them, writing only the time they send. Our integration team sets the connection up with you, with no developer needed, and tests it before anything moves.

How do we know the hours are real across dozens of sites?

Every punch carries the GPS location where it happened, and with location on through the shift the time card shows each job visited, how long the crew stayed and the drives between. Hours are settled by the record, not by memory or a round of phone calls. You choose the controls for each rule group:

  • Site-only clock-in: workers can only clock in inside a job’s geofence. Outside it, the app shows the nearest job and how far away it is.
  • Flags before payroll: punches made outside a fence, late clock-ins and early clock-outs are flagged on the card, and Time Cards filters by them.
  • Forgotten clock-outs: a clock-out made later, from somewhere else, is trimmed back to when the worker left the job, and every trim is in the card’s log.
  • Who punched: each worker clocks in as themselves, on their own phone or with their own kiosk PIN, and a face photo can go on the card at the punch. It’s a photo, not facial recognition.

Location is recorded only on the clock, so this is a record of the workday, not of anyone’s life. Live Locations shows every clocked-in crew, and the job they’re on, on one map right now.

Can hours land on job, phase and cost code the way our ERP is set up?

Yes, because the structure comes from your ERP rather than being rebuilt in Workyard. Jobs, phases and cost codes come in through the connector and go back in the shape your ERP expects. From Foundation, for example, a cost code and its phase come in together as one code (2610:03) and go back split into Cost Code and Phase No. Trades, categories and project tasks work the same way where your ERP uses them. How your system connects.

In the field, nobody scrolls a 70-code list. Each job shows only its own codes, cost code groups narrow them by team or person, and a default code means there’s nothing to pick. In Automatic mode the geofence puts time on the job the worker is standing on, and the code comes from the worker, the foreman for the whole crew or the default. When the work changes mid-day, the foreman switches the code for the crew or the worker switches their own, and a day nobody coded as it went can be split across jobs and codes on the time card afterwards.

Can we see what each job is costing across every division?

Yes, as of the last shift that ended. Each job’s labor and equipment hours and cost update by cost code as shifts end, before anything is approved, on the web and in the app. A crew running heavy on rough-in shows up on Tuesday afternoon, not on the month-end report.

Labor cost is each worker’s hours at their pay rate, with overtime at time and a half, double time at double and workers’ comp included. Taxes and benefits aren’t added. Equipment tagged at clock-in lands on the same job and cost code, beside the labor.

Managers see the jobs you give them, with or without the dollars, and pay rates stay with admins. What Workyard doesn’t do is compare against your budget or estimate: that stays in your estimating system and ERP, now checked against this week’s number. Live job costs.

Some crews share an iPad, some clock in with a foreman, some use their own phones. Can we mix?

Yes. Most large contractors run all three, and every punch lands on the same time cards, approved and exported together.

  • Kiosk: an iPad at the shop, yard or gate. Each worker taps their name and enters their own 4-digit PIN, and the kiosk can take a photo at each punch. Give each kiosk a default job and cost code, choose which crews can clock in there, and run it in English or Spanish. It keeps working without signal.
  • Foreman: the foreman picks the crew, sets the start time, job and cost code, and clocks everyone in at once from one phone. Breaks and job switches go on the whole crew or just the workers who moved, and each worker still gets their own card.
  • Their own phone: workers who move between sites clock in on the app, with GPS on every punch, and the geofence can clock them in as they arrive.

A big gate takes a second iPad to split the 7 AM line. The kiosk runs on iPads with iPadOS 17.5 or later today; Android is coming soon.

Can each division have its own rules, managers and access?

Yes. Rule groups apply to whole teams or to individual workers, and each group carries its own time clock rules, so the office, the shop and each division’s field crews don’t share one setup:

  • Clock-in: auto clock-in at the geofence, a reminder instead, or site-only clock-in.
  • Location: through the shift, only at clock-in and clock-out, or off.
  • Coding: job time from the geofence, required cost codes, defaults, and where drive time goes.
  • Checks: face photos, meal break rules, daily and end-of-period sign-off, and whether workers can edit their own time.
  • Time limits: the earliest clock-in, the latest clock-out and the most hours a card can run.

Overtime rules sit on each worker, with an effective date, so each state’s crews get their own preset. Managers see only what you give them: all projects or the ones they run, all time cards or only their crews’, job financials or just hours and activity, and the right to edit time cards or not. Administrators see everything, and pay rates stay with them.

Whatever size you are, see it on your own jobs

A 30-minute walkthrough with a Workyard specialist: your crew, your systems, your quote.

Book a demo with a Workyard specialist

Your local Workyard specialist

Works with 50 contractors across the US

Your details

30 min · Video call