Skip to content
Log InBook a demo
Book a demo
Free template · paper and digital

Roof Safety Equipment Inspection

Inspects harnesses, lanyards and self-retracting lifelines before roof work, so worn or damaged fall protection gets pulled from use.

WordExcel
  • No email
  • No sign-up
  • Edit it, add your logo

34 checks · 8 sections · Updated Nov 2026

See every check

The template

The full Roof Safety Equipment Inspection

Print it for the clipboard, or put it on your crew’s phones. Same 34 checks either way.

Your logo

Roof Safety Equipment Inspection

A Roof Safety Equipment Inspection form ensures that harnesses, lanyards, anchor points, and guardrails are functional and safe before work at height begins. Use this checklist to protect workers from fall hazards, comply with safety regulations, and reduce liability.

Job
Date

1 · Full Body Harness Inspection

1 · Full Body Harness InspectionYN
1.1D-Rings & Hardware: No deformation, corrosion, or cracks.
1.2Webbing & Stitching: No frays, cuts, or pulled threads.
1.3Buckles & Adjusters: Lock properly and not bent.
1.4Labels/Markings: Tags present and legible.
1.5Impact Indicator: Not deployed or damaged.
Comments

2 · Lanyards & Lifelines

2 · Lanyards & LifelinesYN
2.1Snap Hooks: Auto-locking, undamaged, and corrosion-free.
2.2Lanyard Webbing/Line: No abrasion, UV damage, or fraying.
2.3Shock Absorber: Not deployed; intact stitching.
2.4Energy Absorber Label: Tag present and current.
2.5Lifeline Rope/Cable: No kinks, cuts, or corrosion.
Comments

3 · Self-Retracting Lifelines (SRLs)

3 · Self-Retracting Lifelines (SRLs)YN
3.1Housing Condition: No cracks, dents, or missing labels.
3.2Lifeline Condition: No damage or slow retraction.
3.3Snap Hook & Swivel: Secure, functional, no binding.
3.4Impact Indicator: Not tripped or deployed.
3.5Brake Function Test: Locks under sharp pull.
Comments

4 · Anchors & Anchorage Connectors

4 · Anchors & Anchorage ConnectorsYN
4.1Permanent Anchor Condition: Secure, no corrosion or deformation.
4.2Temporary Anchor Straps: No damage; correctly attached.
4.3Anchor Hardware: Intact, tight, not bent or cracked.
4.4Structural Attachment: Attached to solid surface; no damage.
4.5Horizontal Lifeline System: Cable and anchors secure.
Comments

5 · Guardrails & Barriers

5 · Guardrails & BarriersYN
5.1Top Rail: Proper height and strength.
5.2Midrail/Toeboard: Installed and secure.
5.3Post Attachment: Secure at base with no movement.
5.4Rail Surface: Smooth; no sharp edges.
5.5Openings/Gates: Gaps protected; gates working.
Comments

6 · Lifts / Roof Access Equipment

6 · Lifts / Roof Access EquipmentYN
6.1Control Function Test: All controls tested and working.
6.2Brakes & Mobility: Drive and brakes functional.
6.3Load Capacity Labels: Load chart present and readable.
6.4Safety Devices: Alarms, fall arrest anchor present.
6.5Fluid Leaks: No visible fluid leaks.
6.6Ladder Setup: Extends 3 ft above landing, secured, rungs sound.
Comments

7 · General Information

Jobsite / Location
Inspection TypeDailyWeeklyPre-Use
Weather ConditionsClearWindyWetOther
Comments

8 · Final Sign-Off

8 · Final Sign-OffYN
8.1All Systems Passed: No equipment failed inspection.
8.2Deficiencies Noted: Issues found and documented.
8.3Equipment Tagged Out: Defective items removed from use.
Inspector Name
Date of Inspection
Name
Signature
Date

Upload Photo · photo refs

Free download

Roof Safety Equipment Inspection template: PDF, Word and Excel

Print the form as it is, or download a template you can edit. Every format is free, with no email and no sign-up.

How to use it

How to run the Roof Safety Equipment Inspection

  1. 01

    Check it before the first start

    Do it at the start of every shift, before the machine moves, with the operator who’ll run it.

  2. 02

    Walk around, then test from the seat

    Work through the 8 sections: fluids and the walk-around first, then controls, brakes and safety devices with it running.

  3. 03

    A fail means it stays parked

    Tag out anything that fails and report it to the shop or the super, with a photo. It doesn’t run until it’s fixed.

  4. 04

    Sign it and keep it with the machine

    The operator signs. Keep each day’s sheet with the machine, so the next operator and the inspector can see its history.

Why we built this

Most breakdowns give a warning first

A leak, a worn hose, brakes that feel soft. A few minutes at the start of the shift catches them before they cost a day of downtime, or someone’s safety.

  • Built for the field. Every check is written the way crews talk, with room for notes, photos and a signature.
  • Free, with no catch. No email, no account. Print it and hand it out.
  • On paper or on the phone. The same form runs on the Workyard app, filed to the job when it’s sent.

3,000+contractors run their crews on Workyard

Meet Workyard

Who we are

Workyard is the construction operations platform for specialty contractors and self-performing general contractors determined to grow without sacrificing job control or margins.

Forms like this one are what our customers’ crews fill in on Workyard every day, on the same app they clock in with.

workers on Workyard every day
100,000+
free templates, none of them gated
182

Forms & Workflows

Get every form back from every crew, every day

  • It shows up on its own. Attach it to a task, a job or clock-out, and it’s on the crew’s phone when it’s due.
  • It can’t be skipped. Make it required and the day can’t close until it’s in.
  • You see it the same day. Filed, flagged or missing, every job on one board, before anyone has to call.

$123,000cut from insurance costs at TR3 Group

More equipment pre-start checks templates

Free templates for the rest of the job

  • Equipment Pre-Start Checks

    Fire Extinguisher Inspection Checklist

  • Equipment Pre-Start Checks

    Generator Inspection Checklist

  • Equipment Pre-Start Checks

    Power Tool Inspection Checklist

Browse all templates

Questions

Roof Safety Equipment Inspection FAQs

What equipment should be inspected for rooftop work?

All personal protective equipment (PPE) used for rooftop work should be thoroughly inspected, including harnesses, lanyards, lifelines, anchor points, and guardrails. Ensuring these items are in good condition is critical to preventing falls and maintaining a safe work environment.

How often should roof safety gear be checked?

Roof safety gear should be inspected before each use to identify any visible damage or wear. Additionally, comprehensive inspections should be conducted regularly as specified by the manufacturer’s guidelines to ensure ongoing compliance and safety.

Is documentation required for fall protection inspections?

Yes, maintaining inspection logs is essential, as these records provide proof of compliance with safety regulations and support any safety claims in the event of an incident. Proper documentation also helps track the condition and maintenance history of fall protection equipment.

Can damaged PPE be repaired for reuse?

No, damaged fall protection gear must be removed from service immediately and should never be repaired for reuse. Attempting to fix or reuse compromised equipment can lead to serious safety risks and is prohibited by safety standards.

Do I need a Workyard account to use it?

No. Print the paper form, save it as a PDF, or download the Word or Excel file, free, with no email and no sign-up. You only need an account to put the digital form on your crew’s phones.

Can I edit the template?

Yes. Download the Word or Excel version to add your logo, add checks from your project spec or remove sections you don’t need. They open in Google Docs and Google Sheets too.

How do I get my crew to fill it in on their phones?

Add the digital form to Workyard and attach it to the job or the task it belongs to. It shows up in the app your crew already clocks in with, and every form comes back signed, with its photos, filed to the job.

Trigger the form at the right moment

A job's Forms tab in Workyard: each form, the clock-in or clock-out that triggers it, and how many have been submitted
A van check filled in on the Workyard app: the damage photo, a description and the tech's signature, ready to submit

Book a demo with a Workyard specialist

Your local Workyard specialist

Works with 50 contractors across the US

Your details

30 min · Video call