Concrete forms are the checklists, logs and test records a concrete contractor keeps from the day the forms go up to the day the cylinders break: what was checked before the pour, what happened at the truck, how the crew stayed safe and what strength the concrete reached. Superintendents, concrete foremen and QC inspectors use them on slabs, footings, walls and structural pours.

Concrete forms for every stage of a pour

Each stage of a pour has its own record. Use them in order:

StageFormWhat it records
Planning the workConcrete pouring and masonry JHAEach task's hazards and controls, signed by the crew
Before the pourConcrete pre-pour checklist, rebar inspection checklist, foundation inspection checklistBase, formwork, embeds, reinforcement and mix approved, with sign-off to pour
EquipmentConcrete pump safety checklist, concrete mixer safety inspectionPre-use checks on the pump or mixer truck
During the pourConcrete pour log, reinforced concrete inspection reportEvery truck, fresh-concrete tests, placement, tolerances and cylinders cast
After the pourConcrete strength test recordCylinders from sampling and curing through break results

The category also holds the general forms concrete crews use every day, such as daily reports, equipment logs and delivery receipts.

Which concrete inspection checklist to use, and when

A concrete inspection checklist only helps if it's filled in while the problem can still be fixed. The concrete pre-pour checklist gets signed before the first truck is called: once concrete is in the forms, a misplaced anchor bolt or missing chair is a core drill or a tear-out. It covers site readiness and safety, formwork, embedded items, reinforcement and the mix review, and ends with sign-off by the supervisor, the QC inspector and the building official or engineer of record where required. It names ACI 301, ACI 318 and IBC Chapter 19 as its references; check the editions your contract and jurisdiction use.

The concrete pour log is the concrete checklist for pour day, filled in at the point of discharge. Per truck it records the ticket number, batch time, arrival time, water added and drum revolutions. Then it logs fresh-concrete tests against the spec (slump, air content, temperature, unit weight), placement and vibration, elevations and flatness, the cylinders cast and how they're curing, and the pour's safety checks, with any No carried into a deficiency log.

What should be included in a job hazard analysis for concrete work

A JHA for concrete work breaks the job into the tasks the crew will actually do and names the hazard and control for each. The concrete pouring and masonry JHA lists the usual ones:

  • Formwork setup and form stripping
  • Rebar placement, where exposed bar ends need caps
  • Mixing and pumping, with hoses under pressure and lines that can whip
  • Pouring and vibration
  • Finishing with power trowels
  • Cutting and grinding concrete or block, which makes silica dust
  • Scaffold work at height
  • Block laying, wall bracing and a limited access zone around walls going up

For each one the crew records the hazard, a risk level (low, medium or high) and the control, picks the PPE (including respirators where dust is a risk and rubber boots and gloves for wet concrete, which burns skin), signs, and gets a reviewer's sign-off. The form is meant to be done daily per crew and redone when the task changes. It cites OSHA's construction rules for silica and masonry walls; check the current text for your work.

Download concrete forms or run them on phones

Download any of these concrete forms free as a PDF, Word or Excel file, no sign-up needed. Or run them as digital forms in Workyard's construction inspection app: the foreman fills in the pre-pour and pour log on a phone at the forms, photographs rebar and tickets, gets sign-offs on screen, failed items go to a named person, and every record is filed to the job in the office, ready to export as a PDF or CSV.