Free Earthwork Forms & Excavation Checklists
Free earthwork forms for grading and excavation crews, including a backhoe inspection, a construction site inspection checklist and a concrete pour log. Download them as PDF, Word or Excel, or run them on crews' phones in Workyard.
Earthwork
Browse by use case or industry
Site Inspections
Asphalt Plant Inspection Checklist Form
Equipment Pre-Start Checks
Backhoe Inspection Checklist Form
Equipment Pre-Start Checks
Concrete Mixer Safety Inspection Checklist
Quality Control
Concrete Pour Log
Quality Control
Concrete Pump Safety Checklist
Quality Control
Concrete Strength Test Record
JSAs and JHAs
Confined Space Entry Checklist
JSAs and JHAs
Confined Space Entry JHA
Incident Reporting
Construction Hazard Report Form
Site Inspections
Construction Site Inspection Checklist
Cleanup Checklists
Construction Waste Management Checklist
Site Inspections
Contractor Site Evaluation Form
JSAs and JHAs
Crane & Lifting Operations JHA
Equipment Pre-Start Checks
Crane Inspection Checklist
Equipment Pre-Start Checks
Crawler Crane Safety Inspection Checklist
Daily Reporting
Daily Construction Report
Site Inspections
Deck Inspection Checklist
JSAs and JHAs
Demolition Work Job Hazard Analysis (JHA / JSA)
DVIR / Vehicle Inspections
DOT Inspection Checklist
DVIR / Vehicle Inspections
Driver Vehicle Inspection Report (DVIR)
DVIR / Vehicle Inspections
Dump Truck/Hauler Pre-Trip (DVIR)
DVIR / Vehicle Inspections
DVIR Repair Verification/Mechanic Sign-off Form
Equipment Tracking
Equipment Request Form
Equipment Tracking
Equipment Transfer Form
DVIR / Vehicle Inspections
Fleet Vehicle Weekly/Monthly Inspection Form
Equipment Pre-Start Checks
Forklift Inspection Checklist Form
Commercial Construction
Foundation Inspection Checklist Form
Equipment Pre-Start Checks
Framing Inspection Checklist Form
Equipment Pre-Start Checks
Front End Loader Inspection Checklist
Daily Reporting
Heavy/Civil Construction Daily Report
JSAs and JHAs
Hot Work (Welding/Cutting) JHA
Equipment Pre-Start Checks
Hydraulic Hose Inspection Checklist
JSAs and JHAs
Job Hazard Analysis (JHA) Form
Quality Control
Job Site Orientation Checklist
DVIR / Vehicle Inspections
Light-Duty Truck/Van Daily Inspection Form
Equipment Pre-Start Checks
Mobile Crane/Derrick Inspection
Site Inspections
Pipeline Inspection Report
System Tests
Plumbing Pressure Test Report
Cleanup Checklists
Post-Demolition Cleanup Checklist
Quality Control
Pre-Excavation & Earthwork QC Checklist
Quality Control
Reinforced Concrete Inspection Report
Equipment Pre-Start Checks
Rigging Inspection Checklist
JSAs and JHAs
Roofing Work JHA (Fall Protection)
Site Inspections
Safety & Environmental Inspection
Equipment Pre-Start Checks
Skid Steer / Loader Daily Inspection Checklist
Equipment Pre-Start Checks
Tractor Inspection Checklist
JSAs and JHAs
Trenching & Excavation JHA
Toolbox Talks
Trenching & Excavation Safety Toolbox Talk
DVIR / Vehicle Inspections
Vehicle & Equipment Mileage Log
Cleanup Checklists
Weekly Site Cleanup Audit (Supervisor)
Earthwork
Questions, answered
Why is the excavation for footing forms wider than the actual size of the footing?
Excavations for footing forms are usually dug 6 – 12 in wider than the footing to leave “working space.” The gap lets crews place and strip forms, install rebar, verify dimensions, and pump water away without disturbing soil. A grading-and-footing checklist records these clearances for inspectors.
What is the OSHA standard for excavation?
OSHA’s excavation rules live in 29 CFR 1926 Subpart P. They require daily competent-person inspections, protective systems in 5-ft-plus trenches, safe access every 25 ft, and spoil piles set 2 ft back. Digital excavation checklists document slopes, benching, and soil tests to prove compliance on every shift.
How do you grade a site?
Site grading starts with a survey and cut-fill plan, then crews strip topsoil, rough-grade with dozers, fine-grade with blades, and compact in 6-in lifts to meet density tests and drainage slopes. A mobile grading form logs elevations, compaction readings, and weather so engineers sign off fast.
Get every form back from every crew, every day
Put any template on your crew’s phones. It shows up when it’s due, pre-filled, and lands filed to the job.