Well Inspection Report Form
1 · Casing & Cap
| 1 · Casing & Cap | Pass | Fail | N/A | Notes | |
|---|---|---|---|---|---|
| 1.1 | Casing extends ≥ 12 in above grade | ||||
| 1.2 | Cap tight, insect-proof screen intact | ||||
| 1.3 | No cracks, corrosion, or holes | ||||
| 1.4 | Electrical conduit sealed to cap | ||||
Photos · photo refs
2 · Site Drainage & Setbacks
| 2 · Site Drainage & Setbacks | Pass | Fail | N/A | Notes | |
|---|---|---|---|---|---|
| 2.1 | Ground slopes away 5 ft around well | ||||
| 2.2 | ≥ 100 ft from septic drainfield | ||||
| 2.3 | ≥ 50 ft from fuel / chemical storage | ||||
| 2.4 | ≥ 100 ft from livestock enclosures | ||||
| 2.5 | No ponding or fertilizer mixing nearby | ||||
Photos · photo refs
3 · Pump & Plumbing
| 3 · Pump & Plumbing | Pass | Fail | N/A | Notes | |
|---|---|---|---|---|---|
| 3.1 | Flow test gpm meets demand | ||||
| 3.2 | Pressure tank cut-in/out psi | ||||
| 3.3 | Pump amperage within nameplate ±10 % | ||||
| 3.4 | Wiring insulation intact, conduit secure | ||||
| 3.5 | No leaks at pitless adapter / unions | ||||
Photos · photo refs








