Construction Fire Safety Checklist
1 · Pre-Shift Briefing
| 1 · Pre-Shift Briefing | Y | N | Notes / Attendees | |
|---|---|---|---|---|
| 1.1 | Weather & site conditions reviewed | |||
| 1.2 | Hot-work areas identified & marked | |||
| 1.3 | Fire-watch crew assignments confirmed | |||
2 · Extinguisher Walk-Down
Inspection
| Extinguisher Location / ID | Tag Date Current? | Pressure Gauge in the Green? | Hose/Nozzle Intact? | Pin & Tamper Seal Intact? | Unit Unobstructed? | Within 100 ft Travel Distance? | Notes |
|---|---|---|---|---|---|---|---|
Photos - Extinguisher Walk-Down · photo refs
3 · Hot-Work Permit Log
Log
| Work Area | Permit Posted? | Permit # | Cylinder Stored Safe? | Extinguisher at Work Area? | Combustibles Cleared 35 ft or Shielded? | Post-Work Fire Watch Kept? | Fire Blanket/Secondary Barrier in Place? | Notes |
|---|---|---|---|---|---|---|---|---|
Photos - Hot Work Permit Log · photo refs