An electrical inspection report template gives an electrician or inspector one place to record the condition, safety and code compliance of an existing electrical installation: the panel, the wiring, the outlets and devices, and anything that needs fixing. Electrical contractors use it for maintenance visits, renovations, property sales and insurance requests, in homes, commercial buildings and industrial sites.

What's in the electrical inspection report template

The report runs in seven sections, in the order you'd work through a building.

  1. Panel inspection. Working clearance (the form spells out 30 by 36 by 78 inches of clear space), nothing blocking the panel, secure mounting and grounding, exterior and interior condition, breakers or fuses correctly sized and seated, and an accurate panel directory. The section cites OSHA 29 CFR 1910.303(f) and (g)(1), NEC 110.26 and NEC 408.4.
  2. Circuit and wiring. Conductor sizing for the load, covered and accessible junction boxes, insulation condition, secured conduit, and no overloaded or daisy-chained outlets.
  3. Outlet and device testing. Polarity, ground continuity, GFCI and AFCI protection where required, and no open grounds.
  4. Visual inspection. Physical damage, corrosion or moisture, heat discoloration, loose or frayed conductors, odd smells or noises, missing parts or tampering.
  5. Code violations and recommendations. Whether violations were found, whether an urgent repair is needed, a written list of violations and repairs, and a follow-up date.
  6. Inspector and property information. Address, building type, owner or manager, and the reason for the inspection.
  7. Completion and sign-off. An overall result (pass, pass with maintenance needed, or fail with immediate action), extra photos, the inspector's name, date and signature.

Sections 1 through 4 each have their own photo upload, so the picture of a scorched breaker sits next to the line that failed it.

Commercial vs residential electrical inspection reports

The same electrical inspection form works for both; the building type dropdown and the purpose field tell the reader which kind of visit it was. What changes is where you spend the time.

What changesResidentialCommercial and industrial
Typical reasonSale, insurance, renovationMaintenance, tenant change, insurer or owner request
Panel workOne or two panels, directory often out of dateSeveral panels and switchgear, clearance often blocked by storage
Device testingGFCI and AFCI in kitchens, baths and bedroomsLarger device counts; test a sample and note which ones
Who reads itHomeowner, buyer, insurerFacility manager, owner, insurer

On a commercial job, write down which floors or panels you covered. A report that says pass without saying where reads as a pass for the whole building.

What is a rough-in electrical inspection?

A rough-in electrical inspection happens before walls and ceilings are closed. The inspector looks at boxes, cable runs, supports, nail plates and grounding while everything is still visible. This report is for the other end of the job: finished, energized installations where you test outlets and open the panel. For new work, use the electrical rough-in inspection before drywall, then this report for later checks. For panel-only visits, the electrical panel inspection checklist goes deeper on the panel.

Get the free electrical inspection report

Download the electrical inspection report as a PDF, Word or Excel file. It's free, with no sign-up, and the editable versions let you add your company details or local code items. Or run it on your crew's phones in Workyard with the construction inspection app: photos go in on site, the inspector signs on screen, an urgent repair answer goes straight to the person who schedules the fix, and every report is filed to the job in the office and exports as a PDF to send the client. Check your local code and the current NEC edition your jurisdiction has adopted before relying on any item.