Dampproofing and Waterproofing Inspection
1 · Wall Prep & Coating
| 1 · Wall Prep & Coating | Y | N | N/A | Notes | |
|---|---|---|---|---|---|
| 1.1 | Concrete/Masonry surface clean & dry | ||||
| 1.2 | No efflorescence, oil, or loose material | ||||
| 1.3 | Primer or surface conditioner applied (if spec’d) | ||||
| 1.4 | Basecoat/coating continuous & uniform | ||||
Photos - Wall Prep & Coating · photo refs
2 · Vertical Membranes
| 2 · Vertical Membranes | Y | N | N/A | Notes | |
|---|---|---|---|---|---|
| 2.1 | Membrane full height: top of footing to finished grade | ||||
| 2.2 | Edges and overlaps sealed per manufacturer spec | ||||
| 2.3 | Top termination secure (termination bar or seal) | ||||
| 2.4 | No wrinkles, fish mouths, or unbonded spots | ||||
Photos - Vertical Membranes · photo refs
3 · Drainage Board
| 3 · Drainage Board | Y | N | N/A | Notes | |
|---|---|---|---|---|---|
| 3.1 | Drainage panel installed flush to membrane | ||||
| 3.2 | Coverage from footing to finished grade | ||||
| 3.3 | Protection board or filter fabric in place | ||||
| 3.4 | No damage or gaps from handling | ||||
| 3.5 | Foundation drain installed in gravel, wrapped, and discharging to daylight, a sump or an approved drainage system (IRC R405) | ||||
Photos - Drainage Board · photo refs








