Workyard is the construction operations platform for specialty contractors and self-performing general contractors determined to grow without sacrificing job control or margins.
Forms like this one are what our customers’ crews fill in on Workyard every day, on the same app they clock in with.
workers on Workyard every day
100,000+
free templates, none of them gated
182
Forms & Workflows
Get every form back from every crew, every day
It shows up on its own. Attach it to a task, a job or clock-out, and it’s on the crew’s phone when it’s due.
It can’t be skipped. Make it required and the day can’t close until it’s in.
You see it the same day. Filed, flagged or missing, every job on one board, before anyone has to call.
7:02 AMToolbox talkMeridian Business ParkRay T. · 12 signaturesFiled to job
9:40 AMSite inspectionFairview Clinic · L2 eastDiego M. · 8 photosFiled to job
11:15 AMSite inspectionFairview Clinic · L2 westFirestop answered No at grid C-4Flagged · to the PM
2:14 PMPre-start checkMeridian Business ParkExcavator 3 · Dana C. · signedFiled to job
4:30 PMDaily logRiverside TowerDue at clock-outMissing
Fairview L2 west: firestop at C-4 answered No. Photo attached, PM notified at 11:15 AM. The ceiling stays open until it’s fixed, not a box ticked on a sheet in the truck.
More templates
Free templates for the rest of the job
Paint Application Inspection Checklist
SECTION 2: Surface PreparationYNN/A
Surface visibly clean of contaminants (dirt, oil, grease)?
Surface profile meets spec?
Surface free of loose/flaking paint, rust, or efflorescence?
Inspect pre-1978 buildings before renovation, demolition, or rental turnover. Many jurisdictions, lenders, and insurers also require lead surveys during property sales or when deteriorated paint surfaces are reported. Early testing avoids costly stoppages if hazards surface mid-project and lets contractors price abatement accurately.
What testing methods are EPA-approved?
Certified inspectors use portable X-ray fluorescence (XRF) analyzers for instant, non-destructive readings, or collect paint-chip samples for accredited-lab analysis via atomic absorption or ICP. Both meet EPA and HUD accuracy standards when equipment is calibrated, blanks are run, and chain-of-custody protocols are followed.
How will results appear in the report?
Each tested component lists the numeric lead level and a pass/fail flag against federal thresholds—≥1.0 mg/cm² by XRF or ≥0.5 % by weight from lab data. Positive areas are highlighted on annotated photos or floor plans, with paint-condition notes that rank repair urgency.
What steps follow a positive result?
Intact coatings may be encapsulated; minor peeling gets wet-scrape, repair, and repaint under lead-safe practices. Severely damaged or high-friction surfaces—such as windows—require full abatement or replacement. The report details suitable methods, PPE, clearance testing, and notification duties to tenants, contractors, and local agencies.
Do I need a Workyard account to use it?
No. Print the paper form, save it as a PDF, or download the Word or Excel file, free, with no email and no sign-up. You only need an account to put the digital form on your crew’s phones.
Can I edit the template?
Yes. Download the Word or Excel version to add your logo, add checks from your project spec or remove sections you don’t need. They open in Google Docs and Google Sheets too.
How do I get my crew to fill it in on their phones?
Add the digital form to Workyard and attach it to the job or the task it belongs to. It shows up in the app your crew already clocks in with, and every form comes back signed, with its photos, filed to the job.