Occupied-Space Protection & Cleanup Checklist
Photo Upload (Start) · photo refs
1 · Pre-Work Setup
Barrier & Containment (ICRA-style)
Containment Measures Installed and Verified?
| Containment Measures Installed and Verified? | Y | N | N/A | |
|---|---|---|---|---|
| 1.1 | Rigid barrier or secure plastic sheeting | |||
| 1.2 | Sealed edges (tape/gasket) | |||
| 1.3 | Negative air machine in place | |||
| 1.4 | Anteroom / airlock entry | |||
Walk-Off Mats & Access Control
Checklist
| Checklist | Y | N | N/A | |
|---|---|---|---|---|
| 1.5 | Walk-off mats installed? | |||
| 1.6 | Contractor signage in place? | |||
| 1.7 | Paths clear to entrance? | |||
| 1.8 | Is wet cutting or HEPA vacuum needed? If so, are they installed? | |||
| 1.9 | Is ventilation or air scrubber needed? If so, installed? | |||
| 1.10 | PPE provided (respirator, eyewear)? | |||
Noise & Vibration (for occupied spaces)
Checklist
| Checklist | Y | N | N/A | |
|---|---|---|---|---|
| 1.11 | Quiet tools or mufflers issued? | |||
| 1.12 | Work scheduled per occupant convenience? | |||
2 · Daily Cleanup (optional steps to repeat daily)
| 2 · Daily Cleanup (optional steps to repeat daily) | Y | N | N/A | |
|---|---|---|---|---|
| 2.1 | Debris removed from work area? | |||
| 2.2 | Waste bins available & covered? | |||
| 2.3 | Walking surfaces clear and dry? | |||
| 2.4 | Tools and materials stored neatly? | |||
| 2.5 | Barriers and seals intact; negative pressure verified where used? | |||
3 · Specialized Breakouts
If Hospital Selected
If School/Office Selected