Post-Demolition Cleanup Checklist
Upload photo of site before cleanup: · photo refs
1 · Hazardous Materials Removal
| 1 · Hazardous Materials Removal | Y | N | N/A | |
|---|---|---|---|---|
| 1.1 | Asbestos present? | |||
| 1.2 | If present, removed by a licensed abatement contractor, with clearance or disposal records on file? | |||
Lead-Based Paint
| Lead-Based Paint | Y | N | N/A | |
|---|---|---|---|---|
| 1.3 | Lead-based paint present? | |||
| 1.4 | If present, removed by a trained (and, where required, certified) contractor, with clearance or disposal records on file? | |||
Silica-Generating Work
| Silica-Generating Work | Y | N | N/A | |
|---|---|---|---|---|
| 1.5 | Silica-generating work done? | |||
| 1.6 | If done, Table 1 controls (29 CFR 1926.1153) followed and area cleaned by wet methods or HEPA vacuum (no dry sweeping)? | |||
Other Hazardous Materials
| Other Hazardous Materials | Y | N | N/A | |
|---|---|---|---|---|
| 1.7 | Other hazardous waste encountered? | |||
| 1.8 | If encountered, removed by a licensed hauler, with manifests or disposal records on file? | |||
2 · Debris Disposal
Upload disposal manifest or receipt: · photo refs
3 · Dust Suppression and Air Quality
Dust Control and Monitoring
| Dust Control and Monitoring | Y | N | N/A | |
|---|---|---|---|---|
| 3.1 | Was dust control adequate? | |||
| 3.2 | Was air/dust monitoring performed after cleanup? | |||
| 3.3 | Was respiratory protection used where required (e.g., N95 or higher per Table 1 of 29 CFR 1926.1153)? | |||
Upload air monitoring report if available: · photo refs