A rebar inspection checklist is the record of a check on reinforcing steel after it's placed and tied but before concrete covers it: right bars, right spacing, right cover, proper laps, clean steel and capped ends. Concrete contractors, QC inspectors, ironworker foremen and engineers use it on footings, slabs, walls, columns and beams, for every pour.
What is a rebar inspection?
A rebar inspection compares the steel in the forms against the approved drawings and specs while it can still be fixed. Once concrete is placed, a missing bar or a mat sitting on the ground can't be seen without coring, and the fix might be a tear-out. The inspection usually happens the day of the pour or the day before. Some jobs also need a separate inspection by the engineer, a special inspector or the building department. The specs and the permit tell you which.
What the rebar inspection checklist covers
The checklist runs in seven short sections, most of them Yes or No questions.
| Section | What gets recorded |
|---|---|
| Job and inspection details | Job name, location or zone, date and time, pour number or ID |
| Materials and layout | Bar sizes and grade, bar type (deformed, welded wire, epoxy-coated or other), quantity, mill test certificate, approved drawings verified |
| Placement and supports | Spacing per design and ACI 318, minimum clear cover, chairs and spacers at the right height and stable, ties at intersections, dowels and embeds at the right location |
| Lap splices and connections | Lap lengths per spec or ACI 318, spacing of non-contact laps, couplers installed per the manufacturer, hook lengths and anchorages |
| Cleanliness and condition | Free of form oil, grease and other contaminants, only light rust or mill scale, no bent, cracked or badly corroded bars, no unauthorized field bends |
| Safety checks | Protruding bars guarded against impalement (29 CFR 1926.701(b)), clear access and PPE worn |
| Photos, notes and follow-up | Photos, observations, corrective actions required, approval for placement, inspector name and role, inspector and QA/QC signatures |
What to look at closely
These are the items worth slowing down for, because each one is easy to check now and hard to fix later:
- Cover. Measure from the bar to the form or the ground, not from the chair. A mat that looks right from above can be sitting low where a chair has tipped over.
- Supports. Walk the mat. Chairs that shift underfoot will shift again when the pump hose drags across them.
- Laps. Measure a sample of laps on each bar size rather than eyeballing the whole run.
- Embeds and dowels. Check location and height against the drawings, especially anchor bolts for steel columns. They are the items other trades will build on.
- Contamination. Form release sprayed after the steel went in coats the bars too.
When an item fails, mark it No, note the location and photograph it. The Reinforcement approved for concrete placement answer stays No until every corrective action is fixed and rechecked. The inspector and the QA/QC supervisor both sign.
Get the free rebar inspection checklist
Download the rebar inspection checklist as a PDF, Word or Excel file. It's free, with no sign-up, and the editable versions let you add your job's bar schedule. Use it alongside the concrete pre-pour checklist, which covers forms, embeds, mix and site readiness. In Workyard's construction inspection app, crews fill in the same rebar inspection on their phones at the pour: photos of each failed item, signatures on screen, any No sent to the foreman named to fix it, and every checklist filed to the job in the office, exportable as a PDF. More for the trade is on the concrete industry page.