Concrete Strength Test Record
1 · Sampling
| 1 · Sampling | Y | N | N/A | Note | |
|---|---|---|---|---|---|
| 1.1 | Sample taken from discharge stream at continuous rate | ||||
| 1.2 | Sample taken from the middle portion of the load (not the first or last discharge); molding started within 15 min | ||||
| 1.3 | Sample container clean and moisture-tight | ||||
| 1.4 | Cylinders rodded per C31 (6×12 in: 3 layers; 4×8 in: 2 layers; 25 strokes per layer; sides tapped 10–15 times) | ||||
Photos - Sampling · photo refs
2 · Molding & Curing
Inspection
| Cylinder IDs | Molded Date/Time | Initial Curing Location | Curing Box ID | Box Temperature (°F) | Note |
|---|---|---|---|---|---|
Photos - Molding & Curing · photo refs
3 · Cap Method
| 3 · Cap Method | Y | N | N/A | Entry | Note | |
|---|---|---|---|---|---|---|
| 3.1 | Neoprene pad type / lot # | |||||
| 3.2 | Pad thickness per spec | |||||
Photos - Cap Method · photo refs








