Reinforced Concrete Inspection Report

Checks a pour from rebar and formwork through truck arrival, testing and consolidation, with photos at each checkpoint.

WordExcel
  • No email
  • No sign-up
  • Edit it, add your logo
See every check

The template

The full Reinforced Concrete Inspection Report

Print it for the clipboard, or put it on your crew’s phones. Same 21 checks either way.

Your logo

Reinforced Concrete Inspection Report

Log every pour’s essentials, rebar size and cover, formwork dimensions, mix tickets, slump, temperature, cylinders, vibration, and curing, in one place with our free Reinforced Concrete Inspection Report. Taking inspiration from ACI 318-19, ACI 301-20, ACI 117, 2024 IBC Chapter 17, ASTM C31/C39, and OSHA 1926 Subpart Q, it takes a messy, often paper-based process and simplifies it with a single form.

Job
Date
Project Name / Location
Pour Number / Element ID
Date of Placement
Weather ConditionsClearRainWindyColdHot
Mix Design / Target Strength
Are relevant plans & drawings available?YesNo

1 · Rebar & Embed Inspection

1 · Rebar & Embed InspectionYN
1.1Rebar size and spacing match plans
1.2Clean and free of mud, oil and loose rust or scale
1.3Minimum cover maintained (per ACI 318-19)
1.4Splices and bends per shop drawings
1.5Anchors and embeds placed and secured
1.6Other (describe)

Photos - Rebar & Embed Inspection · photo refs

2 · Formwork & Tolerances

2 · Formwork & TolerancesYN
2.1Dimensions match drawings
2.2Forms clean and oiled
2.3Proper bracing and shoring installed
2.4Openings and blockouts correctly located
2.5Other (describe)

Photos – Formwork & Tolerances · photo refs

3 · Concrete Delivery & Testing

Truck Arrival Time
Batch Ticket #
Batch Time (from ticket)
Discharge Complete Time (per ASTM C94)
Water Added on Site?YesNo
Slump (inches) (per ASTM C143)
Air Content (%) (per ASTM C231/C138)
Concrete Temp (°F) (per ASTM C1064)
Cylinder Samples Taken?YesNo
Cylinder IDs / Storage Temp (per ASTM C31)

4 · Placement & Consolidation

4 · Placement & ConsolidationYN
4.1Free-fall height within project spec limits (no segregation)
4.2Proper vibration / consolidation methods used
4.3Cold joints avoided or treated correctly

Photos - Placement & Consolidation · photo refs

5 · Test Specimens

Log

Cylinder #Age for BreakTarget PSIActual PSINotes

Photos · photo refs

6 · Finish & Curing

6 · Finish & CuringYN
6.1Screed level, grading checked
6.2Finish meets spec (troweled/broom/etc.)
6.3Wet cure / blankets / curing compound applied
6.4Protection in place (wind/sun/freeze)

Photos - Finish & Curing · photo refs

7 · Safety & Housekeeping

7 · Safety & HousekeepingYN
7.1Access ways, egress, fall protection adequate
7.2Shoring tags posted and inspected
7.3Area clean and equipment safely stored

Photos - Safety & Housekeeping · photo refs

8 · Sign-Off

Inspection PassedYes

Inspector (PE or ICC Special)

Name
Name
Signature
Date
Inspection Date

Contractor Supervisor (Optional)

Name
Name
Signature
Date
Date

References & Standards

  • ACI 318-19 – Building Code Requirements for Structural Concrete
  • ACI 301-20 – Specifications for Concrete Construction
  • ACI 117 – Tolerances for Concrete Construction
  • 2024 IBC Chapter 17 – Special inspections for concrete
  • ASTM C31/C39 – Concrete test specimen making & strength testing
  • OSHA 1926 Subpart Q – Concrete and masonry construction safety

Your AHJ and the code edition it has adopted govern. This checklist supports your inspection; it doesn’t replace the one your jurisdiction requires.

Free download

Reinforced Concrete Inspection Report template: PDF, Word and Excel

Print the form as it is, or download a template you can edit. Every format is free, with no email and no sign-up.

How to use it

How to run the Reinforced Concrete Inspection Report

  1. 01

    Check it at the hold point

    Run it before the next trade covers the work, against the plans and the spec.

  2. 02

    Work the sections in order

    Go through the 8 sections in order. Measure where it asks for a number; don’t eyeball it.

  3. 03

    Log every miss with a photo

    Write down what doesn’t meet spec, who fixes it and by when, and attach a photo.

  4. 04

    Sign off when it’s right

    Re-check the fixes, then sign. The signed sheet is your proof the work met spec when it was built.

Why we built this

Rework is the most expensive work you’ll do

A miss caught at the hold point is a quick fix. Caught after the next trade has covered it, it’s a tear-out, a delay and a margin gone.

  • Built for the field. Every check is written the way crews talk, with room for notes, photos and a signature.
  • Free, with no catch. No email, no account. Print it and hand it out.
  • On paper or on the phone. The same form runs on the Workyard app, filed to the job when it’s sent.

3,000+contractors run their crews on Workyard

Meet Workyard

Who we are

Workyard is the construction operations platform for specialty contractors and self-performing general contractors determined to grow without sacrificing job control or margins.

Forms like this one are what our customers’ crews fill in on Workyard every day, on the same app they clock in with.

workers on Workyard every day
100,000+
free templates, none of them gated
182

Forms & Workflows

Get every form back from every crew, every day

  • It shows up on its own. Attach it to a task, a job or clock-out, and it’s on the crew’s phone when it’s due.
  • It can’t be skipped. Make it required and the day can’t close until it’s in.
  • You see it the same day. Filed, flagged or missing, every job on one board, before anyone has to call.

$123,000cut from insurance costs at TR3 Group

More quality control templates

Free templates for the rest of the job

  • Quality Control

    Concrete Pour Log

Browse all templates

Questions

Reinforced Concrete Inspection Report FAQs

When is a concrete inspection required?

Perform the checklist before, during, and immediately after each structural concrete placement—including footings, walls, slabs, and elevated decks—whenever the project specifications or IBC Chapter 17 call for special inspection. Early documentation avoids costly demolitions and reassures officials the pour met code.

Who can sign the report?

A licensed Professional Engineer or ICC-reinforced-concrete special inspector signs daily entries for this report. Their seal, certification number, and employer information confirm competence, satisfying building officials, lenders, and insurers that an independent, qualified party witnessed critical stages of the concrete work.

Who relies on the completed report?

Building departments reference the report to approve structural work under IBC 17; owners and contractors use it to defend change-order claims; lenders and insurers treat it like a structural “four-point” assessment, weighing collateral condition and risk before financing or underwriting.

What if a non-conformance is found?

Note the deviation, issue a non-conformance report, and flag corrective action—extra bars, epoxy repair, or core tests. Keep the item open until an engineer verifies the fix and records acceptance in the Disposition section, preventing hidden defects from compromising structural capacity.

Do I need a Workyard account to use it?

No. Print the paper form, save it as a PDF, or download the Word or Excel file, free, with no email and no sign-up. You only need an account to put the digital form on your crew’s phones.

Can I edit the template?

Yes. Download the Word or Excel version to add your logo, add checks from your project spec or remove sections you don’t need. They open in Google Docs and Google Sheets too.

How do I get my crew to fill it in on their phones?

Add the digital form to Workyard and attach it to the job or the task it belongs to. It shows up in the app your crew already clocks in with, and every form comes back signed, with its photos, filed to the job.

Trigger the form at the right moment

A job's Forms tab in Workyard: each form, the clock-in or clock-out that triggers it, and how many have been submitted
A van check filled in on the Workyard app: the damage photo, a description and the tech's signature, ready to submit

Book a demo with a Workyard specialist

Your local Workyard specialist

Works with 50 contractors across the US

Your details

30 min · Video call