Access ways, egress, fall protection adequateYesNo
Shoring tags posted and inspectedYesNo
Area clean and equipment safely storedYesNo
Photos - Safety & Housekeeping
Sign-Off
Inspection Passed
Select an option
Inspector (PE or ICC Special)
Name
Enter text
Signature
Sign here
Inspection Date
Select a date
Contractor Supervisor (Optional)
Name
Enter text
Signature
Sign here
Date
Select a date
Submit
Scroll through the form
The template
The full Reinforced Concrete Inspection Report
Print it for the clipboard, or put it on your crew’s phones. Same 21 checks either way.
Your logo
Reinforced Concrete Inspection Report
Log every pour’s essentials, rebar size and cover, formwork dimensions, mix tickets, slump, temperature, cylinders, vibration, and curing, in one place with our free Reinforced Concrete Inspection Report. Taking inspiration from ACI 318-19, ACI 301-20, ACI 117, 2024 IBC Chapter 17, ASTM C31/C39, and OSHA 1926 Subpart Q, it takes a messy, often paper-based process and simplifies it with a single form.
Job
Date
Project Name / Location
Pour Number / Element ID
Date of Placement
Weather ConditionsClearRainWindyColdHot
Mix Design / Target Strength
Are relevant plans & drawings available?YesNo
1 · Rebar & Embed Inspection
1 · Rebar & Embed Inspection
Y
N
Note
1.1
Rebar size and spacing match plans
1.2
Clean and free of mud, oil and loose rust or scale
1.3
Minimum cover maintained (per ACI 318-19)
1.4
Splices and bends per shop drawings
1.5
Anchors and embeds placed and secured
1.6
Other (describe)
Photos - Rebar & Embed Inspection · photo refs
2 · Formwork & Tolerances
2 · Formwork & Tolerances
Y
N
Notes
2.1
Dimensions match drawings
2.2
Forms clean and oiled
2.3
Proper bracing and shoring installed
2.4
Openings and blockouts correctly located
2.5
Other (describe)
Photos – Formwork & Tolerances · photo refs
3 · Concrete Delivery & Testing
Truck Arrival Time
Batch Ticket #
Batch Time (from ticket)
Discharge Complete Time (per ASTM C94)
Water Added on Site?YesNo
Slump (inches) (per ASTM C143)
Air Content (%) (per ASTM C231/C138)
Concrete Temp (°F) (per ASTM C1064)
Cylinder Samples Taken?YesNo
Cylinder IDs / Storage Temp (per ASTM C31)
4 · Placement & Consolidation
4 · Placement & Consolidation
Y
N
Notes
4.1
Free-fall height within project spec limits (no segregation)
4.2
Proper vibration / consolidation methods used
4.3
Cold joints avoided or treated correctly
Photos - Placement & Consolidation · photo refs
5 · Test Specimens
Log
Cylinder #
Age for Break
Target PSI
Actual PSI
Notes
Photos · photo refs
6 · Finish & Curing
6 · Finish & Curing
Y
N
Notes
6.1
Screed level, grading checked
6.2
Finish meets spec (troweled/broom/etc.)
6.3
Wet cure / blankets / curing compound applied
6.4
Protection in place (wind/sun/freeze)
Photos - Finish & Curing · photo refs
7 · Safety & Housekeeping
7 · Safety & Housekeeping
Y
N
Notes
7.1
Access ways, egress, fall protection adequate
7.2
Shoring tags posted and inspected
7.3
Area clean and equipment safely stored
Photos - Safety & Housekeeping · photo refs
8 · Sign-Off
Inspection PassedYes
Inspector (PE or ICC Special)
Name
Name
Signature
Date
Inspection Date
Contractor Supervisor (Optional)
Name
Name
Signature
Date
Date
References & Standards
ACI 318-19 – Building Code Requirements for Structural Concrete
ACI 301-20 – Specifications for Concrete Construction
ACI 117 – Tolerances for Concrete Construction
2024 IBC Chapter 17 – Special inspections for concrete
ASTM C31/C39 – Concrete test specimen making & strength testing
OSHA 1926 Subpart Q – Concrete and masonry construction safety
Your AHJ and the code edition it has adopted govern. This checklist supports your inspection; it doesn’t replace the one your jurisdiction requires.
Reinforced Concrete Inspection Report on a phone
Reinforced Concrete Inspection Report
Job *
26-104 Riverside DuplexesSelect a job
Oct 14, 8:12 AM26-104 Riverside Duplexes
Rebar & Embed Inspection
Checkpoint
Rebar size and spacing match plansYesNo
Clean and free of mud, oil and loose rust or scaleYesNo
Minimum cover maintained (per ACI 318-19)YesNo
Splices and bends per shop drawingsYesNo
Anchors and embeds placed and securedYesNo
Other (describe)YesNo
Photos - Rebar & Embed Inspection
Formwork & Tolerances
Checkpoint
Dimensions match drawingsYesNo
Forms clean and oiledYesNo
Proper bracing and shoring installedYesNo
Openings and blockouts correctly locatedYesNo
Other (describe)YesNo
Photos – Formwork & Tolerances
Concrete Delivery & Testing
Truck Arrival Time
Enter text
Batch Ticket #
Enter text
Batch Time (from ticket)
Enter text
Discharge Complete Time (per ASTM C94)
Enter text
Water Added on Site?
YesNo
Slump (inches) (per ASTM C143)
Enter text
Air Content (%) (per ASTM C231/C138)
Enter text
Concrete Temp (°F) (per ASTM C1064)
Enter text
Cylinder Samples Taken?
YesNo
Cylinder IDs / Storage Temp (per ASTM C31)
Enter text
Placement & Consolidation
Checkpoint
Free-fall height within project spec limits (no segregation)YesNo
Workyard is the construction operations platform for specialty contractors and self-performing general contractors determined to grow without sacrificing job control or margins.
Forms like this one are what our customers’ crews fill in on Workyard every day, on the same app they clock in with.
workers on Workyard every day
100,000+
free templates, none of them gated
182
Forms & Workflows
Get every form back from every crew, every day
It shows up on its own. Attach it to a task, a job or clock-out, and it’s on the crew’s phone when it’s due.
It can’t be skipped. Make it required and the day can’t close until it’s in.
You see it the same day. Filed, flagged or missing, every job on one board, before anyone has to call.
7:02 AMToolbox talkMeridian Business ParkRay T. · 12 signaturesFiled to job
9:40 AMSite inspectionFairview Clinic · L2 eastDiego M. · 8 photosFiled to job
11:15 AMSite inspectionFairview Clinic · L2 westFirestop answered No at grid C-4Flagged · to the PM
2:14 PMPre-start checkMeridian Business ParkExcavator 3 · Dana C. · signedFiled to job
4:30 PMDaily logRiverside TowerDue at clock-outMissing
Fairview L2 west: firestop at C-4 answered No. Photo attached, PM notified at 11:15 AM. The ceiling stays open until it’s fixed, not a box ticked on a sheet in the truck.
Perform the checklist before, during, and immediately after each structural concrete placement—including footings, walls, slabs, and elevated decks—whenever the project specifications or IBC Chapter 17 call for special inspection. Early documentation avoids costly demolitions and reassures officials the pour met code.
Who can sign the report?
A licensed Professional Engineer or ICC-reinforced-concrete special inspector signs daily entries for this report. Their seal, certification number, and employer information confirm competence, satisfying building officials, lenders, and insurers that an independent, qualified party witnessed critical stages of the concrete work.
Who relies on the completed report?
Building departments reference the report to approve structural work under IBC 17; owners and contractors use it to defend change-order claims; lenders and insurers treat it like a structural “four-point” assessment, weighing collateral condition and risk before financing or underwriting.
What if a non-conformance is found?
Note the deviation, issue a non-conformance report, and flag corrective action—extra bars, epoxy repair, or core tests. Keep the item open until an engineer verifies the fix and records acceptance in the Disposition section, preventing hidden defects from compromising structural capacity.
Do I need a Workyard account to use it?
No. Print the paper form, save it as a PDF, or download the Word or Excel file, free, with no email and no sign-up. You only need an account to put the digital form on your crew’s phones.
Can I edit the template?
Yes. Download the Word or Excel version to add your logo, add checks from your project spec or remove sections you don’t need. They open in Google Docs and Google Sheets too.
How do I get my crew to fill it in on their phones?
Add the digital form to Workyard and attach it to the job or the task it belongs to. It shows up in the app your crew already clocks in with, and every form comes back signed, with its photos, filed to the job.