Electrical Rough-In Inspection

Walks the electrical rough-in room by room, from service panel to boxes and terminations, so the inspector sees a complete job before walls close.

WordExcel
  • No email
  • No sign-up
  • Edit it, add your logo
See every check

The template

The full Electrical Rough-In Inspection

Print it for the clipboard, or put it on your crew’s phones. Same 39 checks either way.

Your logo

Electrical Rough-In Inspection

Our free Electrical Rough-In Inspection form is used during construction to review electrical wiring, boxes, and conduit placement before drywall or insulation is installed. It ensures systems meet code and function as designed.

Job
Date

1 · General Electrical Requirements

1 · General Electrical RequirementsPassFailN/A
1.1Approved Wiring Method: NEC-compliant for location/use.
1.2Cable Support & Protection: NM/RMC/EMT supported correctly.
1.3Box Fill: Adequate volume for conductor count.
1.4Ground Wires Pigtailed: Per NEC 250.148.
1.5Box Bonding: Metal boxes properly grounded.
1.6Conductor Length: ≥6″ free conductor in each box.
1.7Splices & Connectors: Made in boxes (NEC 300.15); listed, secure and rated for the conductors (NEC 110.14).
1.8Panel Clearance: 30″W x 36″D clear in front of panel.
1.9Other Criteria (describe below)

Photos - General Electrical Requirements · photo refs

2 · Kitchen & Dining Areas

2 · Kitchen & Dining AreasPassFailN/A
2.1Small Appliance Circuits: 2+ 20A circuits for kitchen/dining.
2.2Countertop Receptacles: No point >24″ from an outlet.
2.3Island/Peninsula Outlets: Receptacle, or provision for a future receptacle, per the adopted NEC 210.52(C).
2.4GFCI Protection: All required outlets GFCI protected.
2.5Lighting Outlets: Properly located and switched.
2.6Dedicated Circuits Labeled: For microwave, dishwasher, etc.
2.7Other Criteria (describe below)

Photos - Kitchen & Dining Areas · photo refs

3 · Bathrooms, Laundry & Garage

3 · Bathrooms, Laundry & GaragePassFailN/A
3.1Bathroom Circuit: 20A circuit for bathroom receptacles (NEC 210.11(C)(3)).
3.2Bathroom GFCI: Installed and tested.
3.3Outlet Near Sink: Within 3′ of basin.
3.4Shower/Tub Clearance: No receptacle within 3′ horizontally and 8′ vertically of tub or shower (NEC 406.9(C)).
3.5Laundry Circuit: 20A circuit present and labeled.
3.6Garage GFCI: All receptacles protected.
3.7Dryer/Range Cable Type: 4-wire connection present.
3.8Plumbing Bonding: Water/gas bonded per NEC 250.104.
3.9Other Criteria (describe below)

Photos - Bathrooms, Laundry & Garage · photo refs

4 · Service Panel & Subpanels

4 · Service Panel & SubpanelsPassFailN/A
4.1Service disconnect rating is adequate for the load.
4.2Grounding Electrode Present: Rod/pipe properly bonded.
4.3Working Clearance: 30″ wide, 36″ deep, 78″ height.
4.4Service panel is not located in a bathroom or clothes closet.
4.5All breakers and disconnects are legibly labeled for their loads.
4.6Neutrals are isolated from grounds at any subpanel.
4.7Other Criteria (describe below)

Photos - Service Panel & Subpanels · photo refs

5 · Fixtures, Boxes & Terminations

5 · Fixtures, Boxes & TerminationsPassFailN/A
5.1Ceiling Box Rating: Fan-rated where applicable.
5.2Fixture Clearance: Closet fixtures installed with required spacing.
5.3Recessed Cans: IC-rated if touching insulation.
5.4Wire Connectors: Tight and code-compliant.
5.5Nail Plates: Installed where required.
5.6Junction Box Covers: Present on all accessible boxes.
5.7Other Criteria (describe below)

Photos - Fixtures, Boxes & Terminations · photo refs

6 · Additional Attachments (Optional)

Upload Photos or Files · photo refs

Comments

7 · Project Information

Project Name
Project Address
Contractor or Subcontractor Name
Permit Number
Area of Inspection (e.g., Unit #, Floor, Room)
Requested By
Type of StructureResidentialCommercialMulti-UnitOther
Inspection TypeInitial Rough-InRe-InspectionFinal Rough Electrical

8 · Final Sign-Off

Inspection OutcomePassedPassed with NotesFailed – Reinspection Needed
Summary of Corrections Needed
Follow-Up Date (if required)
Additional Notes
Project / Asset ID
Location
Inspector Name (Printed)
Inspector License or Role
Date of Inspection
Name
Signature
Date
Name
Signature
Date
Date Verified

Free download

Electrical Rough-In Inspection template: PDF, Word and Excel

Print the form as it is, or download a template you can edit. Every format is free, with no email and no sign-up.

How to use it

How to run the Electrical Rough-In Inspection

  1. 01

    Run it before the work is covered

    Walk it before the next trade closes things up or the area is handed over, and again after any fix. Fill in the header first so the record stands on its own.

  2. 02

    Work the sections in order

    Go through the 8 sections in order so nothing gets skipped. Answer every check: a blank isn’t an answer.

  3. 03

    Every miss gets a photo and an owner

    Write down what’s wrong, take a photo and name the trade that owns the fix, with a date.

  4. 04

    Re-check, sign, then release

    Walk the misses again once they’re fixed. Sign it off, and only then let the area close.

Why we built this

An inspection only counts if it’s written down

A miss found before the work is covered up is a quick fix. Found after, it’s a tear-out, a failed inspection and a schedule hit. The written record is how you prove the check happened.

  • Built for the field. Every check is written the way crews talk, with room for notes, photos and a signature.
  • Free, with no catch. No email, no account. Print it and hand it out.
  • On paper or on the phone. The same form runs on the Workyard app, filed to the job when it’s sent.

3,000+contractors run their crews on Workyard

Meet Workyard

Who we are

Workyard is the construction operations platform for specialty contractors and self-performing general contractors determined to grow without sacrificing job control or margins.

Forms like this one are what our customers’ crews fill in on Workyard every day, on the same app they clock in with.

workers on Workyard every day
100,000+
free templates, none of them gated
182

Forms & Workflows

Get every form back from every crew, every day

  • It shows up on its own. Attach it to a task, a job or clock-out, and it’s on the crew’s phone when it’s due.
  • It can’t be skipped. Make it required and the day can’t close until it’s in.
  • You see it the same day. Filed, flagged or missing, every job on one board, before anyone has to call.

$123,000cut from insurance costs at TR3 Group

More site inspections templates

Free templates for the rest of the job

  • Site Inspections

    Fire Inspection Report

Browse all templates

Questions

Electrical Rough-In Inspection FAQs

What is inspected during an electrical rough-in?

Inspectors check wiring paths, box placements, wire gauge, conduit, and bonding before walls are enclosed. This step ensures the electrical system meets code and can be safely energized later.

When should the rough-in inspection happen?

The inspection occurs after wiring and boxes are installed but before insulation or drywall is added. It must happen before concealment to allow visual verification of work.

Who conducts the inspection?

Licensed electricians often conduct the internal inspection, while municipal inspectors perform the official sign-off required to proceed with construction. Coordination ensures both quality control and regulatory compliance.

Why is the rough-in inspection important?

It ensures the electrical infrastructure is safe, code-compliant, and accurately installed before it becomes inaccessible. Catching errors now prevents expensive and invasive repairs later.

Do I need a Workyard account to use it?

No. Print the paper form, save it as a PDF, or download the Word or Excel file, free, with no email and no sign-up. You only need an account to put the digital form on your crew’s phones.

Can I edit the template?

Yes. Download the Word or Excel version to add your logo, add checks from your project spec or remove sections you don’t need. They open in Google Docs and Google Sheets too.

How do I get my crew to fill it in on their phones?

Add the digital form to Workyard and attach it to the job or the task it belongs to. It shows up in the app your crew already clocks in with, and every form comes back signed, with its photos, filed to the job.

Trigger the form at the right moment

A job's Forms tab in Workyard: each form, the clock-in or clock-out that triggers it, and how many have been submitted
A van check filled in on the Workyard app: the damage photo, a description and the tech's signature, ready to submit

Book a demo with a Workyard specialist

Your local Workyard specialist

Works with 50 contractors across the US

Your details

30 min · Video call