A plumbing pressure test report records the test that proves new or repaired piping holds pressure before it is covered, put into service or signed off. Plumbing, mechanical, fire protection and underground utility contractors fill it in for water lines, gas piping, fire protection and process lines, and the inspector or owner's rep signs it with them. It captures the gauge, the setup, the pressures and the hold time, so anyone reading it later can see exactly what was tested and how.

What the plumbing pressure test report records

The form has five sections:

SectionWhat goes in it
General informationProject, location, system or section tested, pipe size and material, test date, start and end time
Pre-test checks and instrumentationGauge ID or serial, gauge range, last calibration date, and a yes/no check of the setup with notes
Test detailsTest type and medium, design pressure, specified test pressure, actual pressure reached, hold time, pressure at the start and end of the hold
Test resultsOutcome, pressure loss observed, photos and documents
Signatures and approvalName, signature and date for the tester, the site supervisor or foreman, and the inspector or owner's representative

Before you pressurize: the pre-test checks

A plumbing pressure test is only as good as its setup, so the form makes you check it before the pressure goes on:

  • The gauge's calibration is current, and its range suits the test pressure.
  • Air vents at high points are open.
  • The test area is closed off with barriers or signs.
  • Fixtures and components not rated for the test pressure are isolated or removed.
  • For a hydrostatic test, the system is filled and the air purged.
  • For a pneumatic test, an exclusion zone is set and a pressure relief valve is installed.

Write a note against any No. A test run with an out-of-date gauge, or with a fixture left in that could not take the pressure, is a test you will likely have to run again.

How to fill out the report

  1. Fill in the general information and gauge details before you start.
  2. Work through the pre-test checklist and note any issues.
  3. Take the specified test pressure and hold time from the job's specs or the inspector. Your local plumbing or fuel gas code and the engineer's specs set those values, and they differ by system and medium.
  4. Bring the system up to pressure and record the actual pressure reached and the pressure at the start of the hold.
  5. At the end of the hold, record the end pressure and any loss.
  6. Record the outcome, attach your photos, and get all three signatures before anything gets covered.

Keep one report per system or section tested. Lumping several zones onto one form makes it hard to show which one passed.

Run it on a phone or download it free

In Workyard the report runs as a digital form on the tester's phone, with gauge photos attached, all three signatures taken on screen, and every report filed to the job in the office for PDF or CSV export. Pair it with the plumbing rough-in inspection, or see more system test forms. You can also download it free as a PDF, Word or Excel file, no sign-up needed.