Plumbing Rough-In Inspection

Checks permits, drain-waste-vent, water supply and venting at rough-in so the inspector can pass the job before walls are closed up.

WordExcel
  • No email
  • No sign-up
  • Edit it, add your logo
See every check

The template

The full Plumbing Rough-In Inspection

Print it for the clipboard, or put it on your crew’s phones. Same 34 checks either way.

Your logo

Plumbing Rough-In Inspection

This smart form helps verify DWV and water supply line installation before cover-up to catch issues early and improve compliance with international plumbing codes.

Job
Date

1 · Permits and Plans

1 · Permits and PlansYN
1.1Job address posted on-site
1.2Permit and approved plans available
1.3Permit information accurate
1.4All fixtures listed and approved
1.5Licensed plumber listed on permit (or homeowner verified)

2 · DWV System Inspection

2 · DWV System InspectionYN
2.1Piping slope and size per fixture unit count
2.2Vents installed downstream of traps
2.3Approved test performed (10-ft head or 5 psi air, 15 min)
2.4Back-to-back fixtures use approved fittings
2.5Pipe transitions maintain sweep and clearance
2.6Proper trap arms, cleanouts, and vent terminations

3 · Water Supply Inspection

3 · Water Supply InspectionPassFail
3.1Water piping size and material per code
3.2Pressure tested with water at not less than working pressure, or 50 psi air (not permitted for plastic pipe)
3.3Main shutoff valve and backflow preventers installed
3.4Water hammer arrestors where quick-close valves are used
3.5Hot/cold lines protected from freezing and properly insulated
3.6Pipe supports, penetrations, and nail plates installed correctly

4 · Underground Piping & Protection

4 · Underground Piping & ProtectionPassFail
4.1Pipes not directly embedded in concrete
4.2Voids and sleeves used at concrete penetrations
4.3Pipes laid on firm bedding
4.4Water service buried below frost line
4.5Tracer wire installed with plastic piping
4.6Copper joints brazed if under slab

5 · Cleanouts and Venting

5 · Cleanouts and VentingPassFail
5.1Cleanouts accessible with correct clearance
5.2Proper slope and orientation of vent pipes
5.3Vents extend minimum 6" above roofline
5.4Vent distances per fixture type are compliant
5.5Island venting uses loop and cleanout correctly
5.6AAVs used only if approved by local code

6 · Support and Protection of Pipes

6 · Support and Protection of PipesPassFail
6.1Pipes supported per UPC Table 313.3
6.2Nail plates used within 1" of framing face
6.3Hangers don’t damage or restrict pipe movement
6.4Sleeves used for masonry/concrete penetrations
6.5Vertical and horizontal supports meet spacing rules

7 · Project Details

Project Name
Project Address
Permit Number
Project TypeResidentialCommercial
Inspection Date & Time
Inspector/Installer Name
Inspector License #
Company / Contractor

8 · Final Review & Sign-Off

Overall Rough-In StatusPASS – Rough-In Approved for CoverFAIL – Corrections Required Before Covering
Inspector’s Comments

Photo Attachments · photo refs

Name
Signature
Date
Date
Name
Signature
Date
Date

Free download

Plumbing Rough-In Inspection template: PDF, Word and Excel

Print the form as it is, or download a template you can edit. Every format is free, with no email and no sign-up.

How to use it

How to run the Plumbing Rough-In Inspection

  1. 01

    Run it before the work is covered

    Walk it before the next trade closes things up or the area is handed over, and again after any fix. Fill in the header first so the record stands on its own.

  2. 02

    Work the sections in order

    Go through the 8 sections in order so nothing gets skipped. Answer every check: a blank isn’t an answer.

  3. 03

    Every miss gets a photo and an owner

    Write down what’s wrong, take a photo and name the trade that owns the fix, with a date.

  4. 04

    Re-check, sign, then release

    Walk the misses again once they’re fixed. Sign it off, and only then let the area close.

Why we built this

An inspection only counts if it’s written down

A miss found before the work is covered up is a quick fix. Found after, it’s a tear-out, a failed inspection and a schedule hit. The written record is how you prove the check happened.

  • Built for the field. Every check is written the way crews talk, with room for notes, photos and a signature.
  • Free, with no catch. No email, no account. Print it and hand it out.
  • On paper or on the phone. The same form runs on the Workyard app, filed to the job when it’s sent.

3,000+contractors run their crews on Workyard

Meet Workyard

Who we are

Workyard is the construction operations platform for specialty contractors and self-performing general contractors determined to grow without sacrificing job control or margins.

Forms like this one are what our customers’ crews fill in on Workyard every day, on the same app they clock in with.

workers on Workyard every day
100,000+
free templates, none of them gated
182

Forms & Workflows

Get every form back from every crew, every day

  • It shows up on its own. Attach it to a task, a job or clock-out, and it’s on the crew’s phone when it’s due.
  • It can’t be skipped. Make it required and the day can’t close until it’s in.
  • You see it the same day. Filed, flagged or missing, every job on one board, before anyone has to call.

$123,000cut from insurance costs at TR3 Group

More site inspections templates

Free templates for the rest of the job

Browse all templates

Questions

Plumbing Rough-In Inspection FAQs

What is the standard rough-in for plumbing?

The standard plumbing rough-in includes installing drain, waste, vent (DWV) lines and water supply lines before walls or floors are closed. Pipes must be correctly sized, sloped, supported, and pressure-tested according to IRC, IPC, or UPC requirements before the official inspection.

What do inspectors look for during a plumbing rough-in inspection?

Inspectors verify correct pipe sizes, slopes, vent placements, cleanout accessibility, and proper support. They also check whether pressure tests pass per code, confirm traps and pipe materials are correct, and ensure DWV and water lines have required clearances and protection before concealment.

How do you pass a rough-in plumbing inspection?

To pass, ensure all plumbing is installed to code, pressure tests hold for the required duration (such as a 10-ft water head for DWV or 80 psi for water lines), and vents, cleanouts, and traps are properly placed. Using a checklist to self-inspect before scheduling helps prevent failures.

When should you schedule a plumbing rough-in inspection?

Schedule the inspection once all DWV and water supply piping is installed and pressure-tested, but before drywall, concrete, or flooring is added. Scheduling too early or too late can lead to delays, failed inspections, or costly rework.

Do I need a Workyard account to use it?

No. Print the paper form, save it as a PDF, or download the Word or Excel file, free, with no email and no sign-up. You only need an account to put the digital form on your crew’s phones.

Can I edit the template?

Yes. Download the Word or Excel version to add your logo, add checks from your project spec or remove sections you don’t need. They open in Google Docs and Google Sheets too.

How do I get my crew to fill it in on their phones?

Add the digital form to Workyard and attach it to the job or the task it belongs to. It shows up in the app your crew already clocks in with, and every form comes back signed, with its photos, filed to the job.

Trigger the form at the right moment

A job's Forms tab in Workyard: each form, the clock-in or clock-out that triggers it, and how many have been submitted
A van check filled in on the Workyard app: the damage photo, a description and the tech's signature, ready to submit