An HVAC rough-in inspection is the check of ductwork, equipment locations, venting, refrigerant lines and condensate drains before walls and ceilings are closed. Mechanical contractors use the checklist to walk their own work before the building inspector arrives, so a failed item costs a quick fix instead of a tear-out after drywall.
What is HVAC rough-in?
Rough-in is the stage when the system's hidden parts are installed but still exposed. Ducts are hung and sealed, line sets are run, drains are piped, and equipment is set or its location framed, but nothing is covered yet. Once insulation and drywall go up, fixing a crushed flex duct or an unsloped drain means opening the wall. That is why the rough-in inspection happens now, and why a permitted job usually has to pass it before the walls are closed. Your permit and local code set the exact requirement.
What the HVAC rough-in inspection checklist covers
Every item is marked Yes, No or N/A, grouped the way an inspector moves through the building.
| Section | Checks |
|---|---|
| Project details | Address, permit number, inspection date |
| Permit and documentation | Permit posted, approved plans on site, permit details correct |
| Ductwork | Design matches plans, duct condition, joints sealed, insulation, supports, flex duct installation |
| Equipment and access | Approved location, clearance to combustibles, service access, attic or crawl access, service receptacle, disconnect, secure mounting, appliance venting |
| Ventilation and exhaust | Bath and kitchen exhaust, dryer exhaust, combustion air intake |
| Refrigerant line set | Lines insulated, installation, leak test |
| Condensate drainage | Primary drain, secondary drain or pan, condensate pump if used |
| Final checks and testing | Duct leakage test, gas piping pressure test, firestopping, site cleanliness |
| Sign-off | Compliance verified, photos, name, company or agency, signature, date |
The usual misses are easy to spot once you look for them: flex duct pulled tight around a corner or sagging between hangers, a disconnect out of reach of the unit, a secondary pan with no drain or float switch, and penetrations through rated walls left without firestopping. Walk those first.
Keeping a log of rough-in inspections
On a single house, one checklist is enough. On a subdivision or a multi-unit building, the checklists become a log: one per unit or lot, each with its permit number, date and result. Sorting them by address shows which units are ready to close up and which are waiting on a fix or a reinspection.
Attach photos to every No. A picture of the unsealed joint, then a second one after it's fixed, settles any question about whether the work was done. Since the HVAC rough-in usually happens alongside electrical and plumbing, the pre-drywall inspection checklist pulls all the trades into one walk before the drywall crew is released.
Get the free HVAC rough-in inspection checklist
Download the checklist as a PDF to print or as a Word or Excel file to add your local code items. It's free, with no sign-up. For techs who'd rather not carry paper, the same checklist runs as a digital inspection form in Workyard's construction inspection app. Crews fill it in on their phones at the job, add photos, sign on screen, and any No goes to the named lead to fix. Every completed checklist is filed to the job in the office and exports as a PDF to hand the inspector or the GC. More forms for the trade are in HVAC and mechanical templates.