A roof inspection checklist is the form a roofer, facility manager or maintenance tech follows on a roof walk to check access and fall protection, the surface, drains, flashings and structure, and record every problem with a photo and a repair date. Roofing contractors, property managers and building owners use it for routine checks, after storms and before warranty claims.
What goes on a roof inspection checklist
The checklist starts with safety, then works from the inside up and the field out to the edges. Each line is answered Yes or No with notes, and every section has room for photos.
| Section | What you check |
|---|---|
| Facility information | Building, roof section ID, roof system type, weather, how you got up there |
| Safety and access | Guardrails or tie-off anchors, fixed ladders and cages, hatches latch, walk pads intact, no loose debris or tools, skylights and openings guarded |
| Interior ceilings and attic | Water stains, wet insulation, mold or odor, daylight through the deck, ventilation, exhaust ducts sealed |
| Surface condition | Blisters and ridges, punctures, tears or missing shingles, seams bonded, ponding, granule loss |
| Drainage | Gutters and scuppers clear, downspouts connected, drain strainers secure, joints not rusted or leaking, water directed away |
| Penetrations and flashings | HVAC curbs and skylights, pipe boots, chimney counterflashing, sealant joints, lightning protection |
| Structure | Soft spots or deflection, parapet caps, edge metal, expansion joints, coping mortar |
| Overall assessment | Good, serviceable or immediate repair, priority repairs, next inspection, sign-off by the inspector and maintenance manager |
If any safety item is a No, the form says to stop and resume only once it's fixed. The references it lists are OSHA 29 CFR 1910.28 for fall protection on walking-working surfaces and the manufacturer's warranty requirements, which vary by roof system. Check the current rule and your warranty terms before you go up.
When to inspect a roof
The form recommends a walk every spring and fall, and after major storms. Spring shows what winter did; fall catches problems before the weather turns. Add a walk after other trades have worked on the roof, since new HVAC units and penetrations are where leaks start. Any No should be scheduled for repair before the next weather event.
Commercial vs residential roof inspection forms
One roof inspection form covers both, because you pick the roof system at the top: single-ply (TPO or PVC), EPDM, built-up, modified bitumen, asphalt shingle, metal or tile. What you spend your time on changes with the roof:
- Commercial, low-slope roofs: ponding, seams, drains and scuppers, HVAC curbs, parapets and edge metal. These roofs fail where water sits or where something pokes through.
- Residential, steep-slope roofs: missing or damaged shingles, granule loss, gutters, pipe boots, chimney flashing, and the attic underneath for stains and daylight.
For large low-slope buildings with many sections, the commercial roofing inspection checklist goes deeper.
How to fill out the roof inspection template
- Give every roof section its own ID and its own checklist. "Roof B, east of the stair tower" can be found again next year; "the roof" can't.
- Check safety and access before anything else.
- Look at the ceilings and attic first. A stain inside tells you where to look outside.
- Walk the surface, then the drains, then every penetration and edge.
- Photograph each No, with something in frame to show where it is.
- List priority repairs, set the next inspection, and sign.
Before crews work at height, check the anchors and lines with a roof fall protection inspection. More forms are in roofing and exteriors.
Download the roof inspection template free as a PDF, Word or Excel file, no sign-up needed. Or run it in Workyard's construction inspection app: the inspector fills it in on a phone on the roof, adds photos to each item, signs on screen, problems go to the person who schedules repairs, and every inspection is filed to the job in the office, ready to export as a PDF.








