A T&M ticket is the daily record of extra work done on time and materials: who worked, how long, what material went in and what equipment ran, signed in the field before anyone argues about it in the office. Contractors and subs use it for work outside the base contract, such as a change in scope or an owner's request that hasn't been priced yet.

What is time and material work?

Time and material work is paid on what it actually took: labor hours at agreed rates, plus materials and equipment at agreed costs, instead of a fixed price. It is common for extra work that can't be priced before it starts. The catch is proof. Every hour and every item has to be backed by a record the owner or GC accepts, and the time and materials ticket is that record.

What goes on the T&M ticket

The time and material ticket template keeps it to what billing needs:

SectionWhat gets recorded
Project detailsProject name and cost code
LaborEach worker, hours worked and hourly rate; the form totals each line
MaterialsEach item, quantity and cost, totaled
EquipmentEach machine or tool, quantity (hours or days) and rate, totaled
Operator sign-offName, signature, shift date and time
ApprovalCost category, supervisor approval and signature, optional owner or inspector signature, billing notes

The form also lists the references it is built around: OSHA 29 CFR 1926.600 for equipment safety, OSHA 29 CFR 1926.601(b)(14) for checking motor vehicles at the start of each shift, and FAR 52.232-7 for payments under time and materials contracts on federal work.

How often to complete a T&M ticket

Fill one in every day the extra work runs, before the crew leaves. Memory fades fast, and a ticket written a week later is the one that gets disputed. A few habits keep tickets paid:

  • Get the GC's or owner's rep's signature the same day, while they can still see the work.
  • Use the cost code from the change or extra-work order, not the base contract code.
  • Write equipment time as run hours or days, and note standby separately in the comments.
  • Attach a photo of the work and any delivery tickets.

Keep a T&M log and tracking sheet

Each signed ticket is one row in your T&M log: date, ticket number, cost code, labor, materials, equipment and total. Keep the log by change order, so when the change order or pay application goes in, every dollar points back to a signed ticket. For run hours across a whole week, the weekly equipment timesheet sits well beside it.

Fill it in on a phone or download it

In Workyard the ticket opens on crews' phones on the job. Operators fill in their hours and equipment, add photos and sign on screen, and the supervisor signs it on the same screen. Every ticket is filed to the job in the office, with PDF or CSV export for billing. See how job cost tracking works, or find more forms under equipment tracking. The template is also free to download as a PDF, Word or Excel file.