A framing inspection checklist lets the superintendent or framing lead walk a house or unit before the building official does, checking anchors, sill plates, floor and roof framing, walls and shear hardware against the plans and code. Home builders, remodelers and framing contractors use it to catch problems while the framing is still open, because everything on it disappears once insulation and drywall go up.
What is a framing inspection?
A framing inspection is the check of a building's structural frame after it's complete and before it's covered. The building official confirms the load path from roof to foundation: how the frame is anchored, how floors and roofs are tied in, how walls carry loads around openings, and how shear walls are nailed and strapped. Mechanical, electrical and plumbing rough-ins are often inspected around the same time, so ask your building department how it sequences them.
What the wood framing inspection checklist covers
The form starts with the job or lot number, building or unit, plan revision date and weather. Each item is marked Pass or Correction Needed, with notes and photos per section.
| Section | What you check |
|---|---|
| Foundation anchors and sill plates | Treated, grade-stamped sill plates, sill sealer, anchor bolt size, embedment and spacing per plan, square washers and nuts tight, plates level and on layout |
| Floor and roof systems | Hangers fully nailed and seated, blocking and bridging, subfloor and roof sheathing nailing, rafters and trusses braced, collar ties, fire blocking at floors, stairs and chases, eave baffles clear |
| Wall framing | Stud spacing per plan, crowns one way, continuous bottom and double top plates, top plate laps, headers sized with full bearing, king, jack and cripple studs, walls plumb and straight, notches and bored holes within limits |
| Shear panels and hardware | Sheathing type and grade, edge and field nailing, nails flush, blocking at panel edges, hold-downs and straps installed and tightened, truss clips and ties as specified |
Each section names the code sections its items come from, including IRC R403.1.6, R502, R602, R602.10 and R802, and IBC 2306 and 2308, with the notch and bore limits at IRC R502.8, R602.6 and R802.7. The form also lists IRC 2021 Section R602, IBC 2021 Chapter 23 and the AWC NDS-2018. Your jurisdiction may have adopted a different edition or local amendments, and the plans and truss drawings govern where they're more specific, so check both.
Basement framing inspection checklist
The same form works as a basement framing inspection checklist. Mark the sill plate and anchor rows for any wall plate sitting on concrete, which should be treated lumber, and pay extra attention to fire blocking at soffits, chases and the top of walls where they meet the floor framing above. Check where the plumber and electrician bored through plates and studs, since basements collect a lot of late runs. Insulation and moisture rules for basement walls vary by location, so confirm them with your local code before close-in.
Pass, correction needed and re-inspection
Every item marked Correction Needed has to be fixed and re-checked before close-in. Write the note so the framer can find it without you: "Missing hold-down, NE corner, garage" rather than "hardware". Photograph it before and after. The sign-off has two blocks: the inspector or building official, and the superintendent where required. Once framing passes, the next walk is the pre-drywall inspection checklist; for the work underneath, use the foundation inspection checklist.
Run it in Workyard or download it free
In Workyard, the framing checklist is a digital form your superintendent fills in on a phone at the house, with photos of each correction and signatures on screen. A Correction Needed can go straight to the framing lead, and every inspection is filed to the job in the office, ready to export as PDF or CSV. See construction inspections in Workyard and how it fits home building crews. Or download the free template as a PDF, Word or Excel file.